EcoVac Solutions Ltd. - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
019-1689
Ministry reference number
1000085432
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal Updated
Proposal posted
Comment period
April 23, 2020 - June 7, 2020 (45 days) Closed
Last updated

There is no requirement to post this notice on the Environmental Registry of Ontario, but we want to hear your thoughts. Submit a comment and tell us what you think. Learn about the consultation process and types of notices on the registry.

Update Announcement

A decision for this proposal has been published as a Bulletin under ERO 019-5520 on June 21, 2022

This consultation was open from:

April 23, 2020
to June 7, 2020

Proposal summary

This proposal is for a new Environmental Compliance Approval for industrial sewage treatment and stormwater management works servicing EcoVac Solutions Ltd., located at 60A Baywood Road in the City of Toronto, Ontario.

Location details

Site address

60A Baywood Road
Toronto, ON
M9V 3Z3
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

EcoVac Solutions Ltd.
4001 Chesswood Drive
North York, ON
M3J 2R8
Canada

Why consultation isn't required

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.

Proposal details

This proposal is for a new Environmental Compliance Approval for industrial sewage treatment and stormwater management works servicing EcoVac Solutions Ltd., located at 60A Baywood Road in the City of Toronto, Ontario.

The stormwater management works comprise of stormwater quality and quantity control, and include diversion of runoff to tanks used for materials processing. Outdoor drainage catchment areas will discharge to nearby storm catchbasins. The area adjacent to the new processing facility will collect and direct stormwater to the on-site process water treatment system.

The industrial sewage treatment works are comprised of materials collection, sedimentation separation, centrifuge dewatering, and clay and granular activated carbon filtration polishing. Treatment equipment is designed to meet effluent quality requirements for reuse in hydro-excavation activities or prior to discharge to existing on-site sanitary sewers when required.

The ministry may require monitoring of the industrial wastewater and stormwater effluent discharge leaving the site.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Comment

Commenting is now closed.

The comment period was from April 23, 2020
to June 7, 2020

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice