August 28, 2024 - September 27, 2024 (30 days) Closed
Last updated
The Director of Exploration has made a decision on the exploration permit application PR-24-000178 to Neotech Metals Corp. for early exploration activities.
The decision is to issue the mineral exploration permit.
August 29, 2024 - September 28, 2024 (30 days) Closed
Last updated
Permit to Take Water No. 3312-D47FPS was issued to 1589873 Ontario Limited on October 3, 2024, to renew Permit to Take Water No. 0788-9SSKGS for golf course irrigation and clubhouse water supply purposes. Water will be taken from one pond, one watercourse, and one well at the Flamborough Hills Golf Club, located in Copetown, Ontario for 10 years.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-9117
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
September 5, 2024 - October 7, 2024 (32 days) Closed
Last updated
R.W. Tomlinson Limited seeks to amend the current site plan to change the final rehabilitation from a pond to a filled-to-grade landform, allowing for the importation of excess soils.
Instrument type:
Changes to the site plan for a pit or quarry
ERO number
019-9116
Notice type
Instrument
Notice stage
Proposal
Proposal posted
Comment period
September 5, 2024 - October 7, 2024 (32 days) Closed
Last updated
Washington Sand & Gravel Ltd. has applied to amend the site plan to allow for the importation of excess soil to backfill the site to the pre-extraction elevations.
Establishment of industrial stormwater management works for the collection, transmission, treatment and disposal of stormwater run-off from a total catchment area of 11.41 hectares (to be developed for a Refrigerated Warehousing and Storage Facility), to Enhanced Level water quality, erosion protection and quantity control.
September 4, 2024 - October 19, 2024 (45 days) Open
Last updated
This proposal is for the renewal of Environmental Compliance Approval No. A920232-001 for West Nipissing Sanitation Inc. for a Hauled Sewage Waste Disposal Site, located at 694 Olivier Road in Verner, Ontario.
October 18, 2023 - December 2, 2023 (45 days) Closed
Last updated
A new Environmental Compliance Approval is granted to Joseph & Company Inc for an industrial stormwater management (SWM) works to service a metal recycling facility located at 34 Lancaster Street West, in the City of Kitchener.
Permit to Take Water No. 1132-D8RQ8X was issued to Lavern Heideman & Sons Limited to renew Permit to Take Water No. 3415-9MGPM9 for other Industrial purpose. Water will be taken from one pond, located in Eganville, County of Renfrew, Ontario for 10 years.
Permit to Take Water No. P-300-8275305508 was issued to Miller Group Inc. on September 4, 2024 for manufacturing purposes. Water will be taken from one well at the Miller Concrete Plant, located at 6690 Minto Line 12 in Harriston, Ontario.
September 4, 2024 - October 19, 2024 (45 days) Open
Last updated
This proposal is to renew the Environmental Compliance Approval No. 7023-CCXTDY for P. E. Inglis Holdings Inc. for a Hauled Sewage Waste Disposal Site, located at 1465 Concession Road 2 in Teeswater, Municipality of South Bruce, Ontario.
September 4, 2024 - October 4, 2024 (30 days) Closed
Last updated
This proposal is for a new Permit to Take Water for St. Rita at Marylake Long Term Care Home.Water will be taken from one well for foundation drainage purposes at 13760 Keele Street in King City, Ontario.
September 4, 2024 - October 19, 2024 (45 days) Open
Last updated
This proposal is for an amendment to the Limited Operational Flexibility for the Environmental Compliance Approval No. 1160-9H4KLS for Kubota Materials Canada Corporation, a foundry facility manufacturing steel alloy castings and custom-designed steel assemblies, located in the City of Orillia, Ontario.
September 4, 2024 - October 4, 2024 (30 days) Closed
Last updated
This proposal is for a new Permit to Take Water for Mattamy (Northwoods) Limited. Water will be taken from three ponds for construction dewatering purposes at 1020 March Road in the City of Ottawa, Ontario.
September 4, 2024 - October 19, 2024 (45 days) Open
Last updated
This proposal is for a renewal and amendment to the Limited Operational Flexibility for the Environmental Compliance Approval (Air & Noise) No. 0372-9LMKDZ for Dimachem Inc., a batch chemical manufacturer located at 3258 Marentette Avenue in the City of Windsor, Ontario.
Approval is granted to 2667804 Ontario Inc. ( Operating as Recycle City ) to operate the waste transfer/processing facility for acceptance and processing of solid non-hazardous waste, liquid industrial waste, and hazardous waste, liquid soil from hydrovac operations.
The Director of Exploration has made a decision on the exploration permit application PR-24-000155 to Agnico Eagle Mines Limited for early exploration activities.
The decision is to issue the mineral exploration permit.
Instrument type:
Approval of a municipality’s official plan
ERO number
019-7195
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
June 21, 2023 - August 20, 2023 (60 days) Closed
Last updated
A decision was made on September 3, 2024 to modify and approve in part, the Region of Durham Official Plan, as adopted by By-Law 38-2023. The approved official plan outlines a comprehensive framework of new and revised policies to guide future growth and development in Durham Region to 2051.