November 5, 2025 - December 20, 2025 (45 days) Closed
Last updated
Approval has been granted for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) from Dana Canada Corporation, a manufacturer of heat exchanger products for the automotive industry and an operator of a ground water remediation system, located in the City of Cambridge, Ontario.
October 31, 2025 - December 15, 2025 (45 days) Closed
Last updated
An amended Environmental Compliance Approval was issued to include previously constructed existing stormwater management works to provide quality and quantity control, discharging into municipal storm ditches at the AOC RESINS AND COATINGS COMPANY site.
October 31, 2025 - December 15, 2025 (45 days) Closed
Last updated
Approval has been granted for an Environmental Compliance Approval with Limited Operational Flexibility (air and noise) from Dana Canada Corporation, a thermal products manufacturing facility, located in the Town of Oakville, Ontario.
November 7, 2025 - December 22, 2025 (45 days) Closed
Last updated
An amendment to Environmental Compliance Approval (waste disposal site) No. 4462-AD6P6S was issued to 781998 Ontario Inc., for a non-hazardous solid waste transfer facility located in the Township of Champlain, Ontario.
The amendment is for an orientation change & other site modifications.
November 3, 2025 - December 18, 2025 (45 days) Closed
Last updated
An Environmental Compliance Approval (air & noise) has been issued to Blair Asphalt Products Ltd. This approval is to amend the previous issued ECA No. 1187-BQY5M4 for Blair Asphalt Products Ltd. for the operation of a hot-mix asphalt plant, located in the St. Albert, Ontario.
Instrument type:
Approval of a municipality’s official plan
ERO number
025-1206
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
November 4, 2025 - December 4, 2025 (30 days) Closed
Last updated
A decision was made on May 15, 2026, to approve, with modifications, a new official plan for the Municipality of Magnetawan, to achieve consistency with provincial policies, and to manage and direct physical (land use) change within the municipality.
November 7, 2025 - December 22, 2025 (45 days) Closed
Last updated
Approval is granted for a new Environmental Compliance Approval (industrial sewage) to establish stormwater management works owned by SCAL Properties Ltd., to service a proposed Equipment Storage Yard Facility for the collection and disposal of stormwater runoff from a property located on Lot 20, Concession 4, in the Town of Whitchurch-Stouffville.
October 31, 2025 - November 30, 2025 (30 days) Closed
Last updated
Permit to Take Water No. 6526-DSFNUU was issued to Ontario Custom Aggregates Limited. Water will be taken from one pond for aggregate washing purposes.
October 31, 2025 - December 15, 2025 (45 days) Closed
Last updated
A new Environmental Compliance Approval was granted to 2572306 Ontario Inc., for existing and proposed sewage works at a total maximum daily flow capacity of 72, 598 litres per day to service 53 existing and 15 new mobile home lots located at 11981 Plank Road, Bayham Municipality, County of Elgin.
October 31, 2025 - November 30, 2025 (30 days) Closed
Last updated
Permit to Take Water No. P-300-5384918522 has been issued to MANITOULIN TROUT FARMS INC., for aquaculture purposes. Water will be taken from four wells, located in Coldwater, Ontario.
November 3, 2025 - December 3, 2025 (30 days) Closed
Last updated
Permit to Take Water No. P-300-3382204449 has been issued to INVERARY GOLF & COUNTRY CLUB INC. for golf course irrigation and water supply purposes. Water will be taken from three drilled wells and four ponds: Clubhouse Well, Shop Well, Backup Well; and Ponds 1, 2, 3 and 4, in South Frontenac.
November 3, 2025 - December 18, 2025 (45 days) Closed
Last updated
Approval is granted for an amendment to Environmental Compliance Approval No. 0314-CWVNWY for Beckley Beach Cottagers’ Corporation, to revise the Groundwater Monitoring Conditions, and to replace an existing Class 5 Holding Tank on a property described as Lots 15 to 78, Registered Plan no. 776, Geographic Township of Sherbrooke.
November 4, 2025 - December 19, 2025 (45 days) Closed
Last updated
An Environmental Compliance Approval (air & noise) was issued to St. Marys Cement Inc. (Canada) operating as CBM Ready Mix for the operation of three ready-mix concrete batching plants, located in Bowmanville, Ontario.
November 7, 2025 - December 7, 2025 (30 days) Closed
Last updated
Permit to Take Water No. P-300-1105467667 version 2.0 was issued to Seven Lakes Golf Course Ltd. on March 12, 2026, to renew Permit to Take Water No. P-300-1105467667 version 1.0 for golf course irrigation purposes. Water will be taken from two ponds and two wells in LaSalle, Ontario for 10 years.
October 31, 2025 - November 30, 2025 (30 days) Closed
Last updated
Permit to Take Water No. 0378-DQQRR6 has been issued to St. Albert Cheese Co-operative Inc., for industrial food processing for a cheese production plant. Water will be taken from four wells in The Municipality of The Nation, Ontario.
November 6, 2025 - December 21, 2025 (45 days) Closed
Last updated
A new Environmental Compliance Approval is granted to Aecon Kiewit Nuclear Partners for the collection, transmission, treatment and disposal of cooling water for a tunnel boring machine (TBM) and construction water at Darlington Nuclear Power Generation Station.
November 4, 2025 - December 19, 2025 (45 days) Closed
Last updated
The director has amended Environmental Compliance Approval (air & noise) No. 6254-9LVQ3V for Imperial Oil Limited, a refining and petrochemical manufacturing facility located in the City of Sarnia, Ontario.