Cargill Limited - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-8677
Ministry reference number
5766-D46L6U
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
May 13, 2024 - June 27, 2024 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
June 27, 2024

Proposal summary

This proposal is for an amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 3678-C6EHCX for Cargill Limited, a meat processing facility located in the City of Brampton, Ontario.

Location details

Site address

235 Nuggett Court
Brampton, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Cargill Limited
235 Nuggett Court
Brampton, ON
L6T 5H4
Canada

Proposal details

This proposal is for an amendment to the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) No. 3678-C6EHCX for Cargill Limited, a meat processing facility located in the City of Brampton, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include cooling towers, maintenance welding, broilers, and processes for raw meat product packaging, storage, production, and shipping activities.

The proposed amendment includes updates to the facility sound levels for current operations from the following noise sources:

  • cooling towers
  • air-cooled condensers
  • make-up air unit
  • nitrogen tunnel roof exhausts
  • nitrogen unloading from trucks, and
  • on-site transport truck movements

Emissions to the air from this facility include:

  • nickel
  • carbon dioxide
  • chromium
  • manganese, and
  • particulate matter

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice