This consultation was open from:
August 22, 2023
to October 23, 2023
Decision summary
William Day Construction Limited was issued a licence to extract aggregate from a quarry in the City of Greater Sudbury.
Location details
Site location details
City of Greater Sudbury, District of Sudbury.
Part of Lot 10, Concession 6, Geographic Township of McKim.
This site has coordinates at Latitude 46.53143° N Longitude 81.04364° W.
A link to our mapping tool allows you to locate and view licensed sites under the ARA
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
William Day Construction Limited
2500 Elm Street, Box 1060
Azilda,
ON
P0L 1B0
Canada
Decision details
Aggregate Resources Act (ARA) licence # 626538 was issued to William Day Construction Limited on March 26th, 2025, subject to conditions specified on Schedule A for a Class A licence.
The licensed area is 38.4 hectares in size with an extraction area of 11.04 hectares and allows for the operation of a quarry above the water table. A maximum of 700,000 tonnes of aggregate may be removed from the site in any calendar year.
A copy of the licence can be obtained by contacting the Ministry office and contact identified below.
Effects of consultation
Zero (0) comment was received in response to the Environmental Registry of Ontario consultation process.
Two (2) comments were received in response to the ARA consultation process.
The comments were related to:
- Wetlands
- Impact to natural environment
- Species habitat
- Hydrogeology
- Site plan standards
- Summary statement
- Cultural heritage
- Ground water impact
- Final rehabilitation.
The applicant worked to address the comments by providing additional information, amending technical studies, and revising the site plan. All comments were resolved.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
How to Appeal
This instrument decision can be appealed. You have 15 days from April 8, 2025 to begin the appeal process.
Carefully review the information below to learn more about the appeal process.
How to appealClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park
5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
William Day Construction Limited
2500 Elm Street, Box 1060
Azilda,
ON
P0L 1B0
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Include the following:
This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.
Connect with us
Contact
Veronique Falardeau
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
Original proposal
Proposal details
William Day Construction Limited has applied for a Class A licence, Quarry Above Water, to excavate aggregate from a quarry of 38.4 hectares in size with an extraction area of 11.74 hectares.
This application is for the establishment of a new quarry. The annual tonnage condition applied for is 700,000 tonnes.
Other information
The extraction of aggregate from a pit or quarry on private land designated by regulation, in the Province of Ontario, requires the issuance of a licence. Ontario Regulation 244/97 and the Aggregate Resources of Ontario Standards set out the application process and requirements.
For each new licence, the applicant must provide information (site plan, summary statement, technical reports) with respect to the existing features, operation and rehabilitation of the site to demonstrate that the proposed operation will minimize adverse impact on the environment.
For this proposal, the following information has been prepared and submitted to the Ministry of Natural Resources and Forestry (MNRF):
- Site plan
- Summary Statement
- Natural Environment Report
- Cultural Heritage Report
- Maximum Predicted Water Table Report (Letter of Opinion Groundwater Elevation)
The Site Plan addresses existing features of the quarry area (existing natural features and land use on and surrounding the site within 120 meters); the proposed operation (shape, dimensions, area and depth to be excavated, method of extraction); and progressive and final rehabilitation.
The Summary Statement includes information on one or more of the following considerations:land use planning, agricultural classification, quality and quantity of aggregate, haul routes, truck traffic and entrance permits, progressive and final rehabilitation, surface water, and elevation of the established groundwater table.
The Natural Environment Report identifies the presence of significant natural heritage features/areas that exist on the site or within 120 meters of the site. Where any of the features or areas have been identified, the report must identify and evaluate any negative impacts on the features or areas and ecological functions, and identify any proposed preventative, mitigative or remedial measures. The report must also identify if the application site or any of the features are located within a natural heritage system that has been identified by a municipality in ecoregions 6E and 7E or by the province as part of a provincial plan.
The Cultural Heritage Report must be consistent with provincial requirements under the Ontario Heritage Act and the Provincial Policy Statement. Screening checklists evaluating the potential for archaeological resources, built heritage and cultural heritage landscapes, with supporting documentation, is required. Where screening indicates that assessments are requirement to be completed, the assessment reports and letters from the Ministry of Heritage, Sport, Tourism and Cultural Industries must be obtained.
A report must be prepared that details how the maximum predicted water table is identified in metres above sea level, relative to the proposed depth of excavation at the site. Applications proposing to excavate below the maximum predicted water table must complete a Water Report. Level 1 determines the potential for impacts to ground water and surface water resources and their uses. If the Level 1 identifies a potential for impacts resulting from the operation, then an impact assessment (Level 2) is required to determine the significance of the effect and potential for mitigation.
A Noise Assessment report is prepared if proposed excavation and/or processing facilities are within 150 meters (for pit applications) or 500 meters (for quarry applications) of a sensitive receptor. The report is required to determine whether provincial guidelines for Stationary and Transportation Sources can be satisfied.
A Blast Design report is prepared if a sensitive receptor is within 500 metres of the limit of excavation for a Class A quarry application. The report is required to demonstrate that provincial guidelines for blast overpressure and ground vibration can be satisfied.
An Agricultural Impact Assessment Report is completed in accordance with provincial guidance where a provincial plan requires such an assessment in prime agricultural areas.
The Ministry reviews all comments received through the Environmental Registry and the notification and consultation process under the Aggregate Resources Act (ARA), and considers them before making a decision. Comments received through the Environmental Registry are considered by the Ministry however, the process under the ARA is proponent driven. This means that comments for consideration by the applicant under the ARA process must be submitted to the applicant and the Ministry during the 60-day consultation period initiated by the applicant.
Details of the application process can be found in Ontario Regulation 244/97 under the ARA and on the Ministry website at aggregate resources\ontario.ca. Many regulatory changes for new applications took effect on April 1, 2021. This means that applications submitted after March 31, 2021 must meet the new requirements in Ontario Regulation 244/97 and Aggregate Resources of Ontario Standards.
Public consultation opportunities
Written notice concerning this application was delivered to landowners within 120 meters of the proposed licensed boundary; an information sign, giving notice to the public of this application, was erected at the proposed site; and a Public Notice of Application appeared in the local paper, Le Voyageur on July 21, 2021 and in the Sudbury Star on July 22, 2021.
The information submitted in support of this application can be viewed at William Day Construction Limited, 2500 Elm Street, Azilda or by contacting Darren Tegel at 705-682-1555 (toll free 1-800-461-0879). A virtual information session to present the details of the proposed new licence took place on July 30th, 2021.
The application for this licence is being circulated within the Ministry of Natural Resources and Forestry. Additionally, notification of this application has been forwarded to the City of Greater Sudbury, Sudbury Conservation, Ministry of Environment, Conservation and Parks, Fisheries and Ocean Canada, and the Ministry of Tourism, Culture and Sport.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
Comment
Commenting is now closed.
This consultation was open from August 22, 2023
to October 23, 2023
Connect with us
Contact
Veronique Falardeau
300 Water Street, 4th Floor, South tower
Peterborough,
ON
K9J 3C7
Canada
Comments received
Through the registry
0By email
2By mail
0