This consultation closes at 11:59 p.m. on:
February 28, 2026
Proposal summary
This proposal is for a renewal to Permit To Take Water No.1230-A8TJHP for Watch Tower Bible and Tract Society of Canada for irrigation, water supply and cooling water purposes. Water will be taken from four wells in Halton Hills, Ontario.
Location details
Site address
13893 Highway 7
Georgetown,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Watch Tower Bible and Tract Society of Canada
13893 Highway 7 Road
Georgetown,
ON
L7G 4S4
Canada
Proposal details
This proposal is for a renewal to Permit To Take Water No.1230-A8TJHP for Watch Tower Bible and Tract Society of Canada for irrigation, water supply and cooling water purposes. Water will be taken from four wells in Halton Hills, Ontario. Details of the water taking are as follows:
Permit type - Renewal
Source name: Well #1
- purpose: facility operations, irrigation
- maximum rate per minute (litres/min): 341
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 245,520
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): January 1st
- latest calendar date of taking (mm/dd): December 31st
- period of taking: 10 Years
Source name: Well #2
- purpose: communal supply, water supply
- maximum rate per minute (litres/min): 246
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 177,120
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): January 1st
- latest calendar date of taking (mm/dd): December 31st
- period of taking: 10 Years
Source name: Well #3
- purpose: communal supply, water supply
- maximum rate per minute (litres/min): 189
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 136,080
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): January 1st
- latest calendar date of taking (mm/dd): December 31st
- period of taking: 10 Years
Source name: Well #4
- purpose: industrial
- maximum rate per minute (litres/min): 1,136
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 1,635,840
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): January 1st
- latest calendar date of taking (mm/dd): December 31st
- period of taking: 10 Years
There are three categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Let us know what you think of our proposal.
Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.Read our commenting and privacy policies.
Submit online
Submit by mail
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada