Carmeuse Lime (Canada) Limited - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
025-1242
Ministry reference number
3932-DKYNZA
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal Updated
Proposal posted
Comment period
October 13, 2026 - November 27, 2026 (45 days) Open
Last updated

Update Announcement

The notice was originally posted on November 5, 2025, with 45 days comment period. On October 13, 2026, the notice was updated to reflect its conversion to an ECA with Operational Flexibility. The comment period has been reopened for 45 days.

This consultation closes at 11:59 p.m. on:
November 27, 2026

Proposal summary

This proposal is to amend the Environmental Compliance Approval (air & noise) No. 4649-57YQR9 for Carmeuse Lime (Canada) Limited, a lime manufacturing facility located near the Town of Blind River, Ontario.

Location details

Site address

3136B Highway 17 East
Blind River, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Carmeuse Lime (Canada) Limited
P.O. Box 1690
Blind River , ON
P0R 1B0
Canada

Proposal details

This proposal is to amend the Environmental Compliance Approval (air & noise) No. 4649-57YQR9 for Carmeuse Lime (Canada) Limited, a lime manufacturing facility located near the Town of Blind River, Ontario.

The amendment requested includes:

  • adding operational flexibility conditions to the approval;
  • the removal of one lime kiln; and
  • the replacement of one baghouse.

The sources at the facility include kilns; baghouses; and ancillary handling, transferring, screening, crushing, and processing of limestone, coal, petroleum coke, and lime products. Major contaminant emissions to the air include:

  • particulate matter;
  • metals such as manganese and nickel;
  • calcium oxide;
  • hydrogen chloride; and 
  • products of combustion such as nitrogen oxides and sulphur dioxide.

The Environmental Compliance Approval with Operational Flexibility (Air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Operational Flexibility (Air). The operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions. 

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice