This consultation was open from:
November 25, 2025
to January 9, 2026
Decision summary
Arvin Sango Canada Inc. requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued.
Location details
Site address
2330 Discovery Drive
London,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Arvin Sango Canada Inc.
2330 Discovery Drive
London,
ON
N6M 0C6
Canada
Decision details
Arvin Sango Canada Inc. requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued. The ministry closed the file on September 2, 2026.
Effects of consultation
No comments were received.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
How to Appeal
Appeals are not allowed
File was withdrawn by the applicant.
Connect with us
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Original proposal
Proposal details
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Arvin Sango Canada Inc., an automotive parts manufacturing facility, located in the City of London, Ontario.
The application includes all sources at the facility, including:
- welding operations
- a natural gas emergency power generator
- natural gas fired combustion equipment
- dust collectors
- argon storage tanks, and
- QA/QC laboratory fumehoods
Emissions to the air from this facility include:
- hexavalent chromium
- manganese
- nickel
- nitrogen oxides
- particulate matter, and
- noise
The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Comment
Commenting is now closed.
This consultation was open from November 25, 2025
to January 9, 2026
Connect with us
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Comments received
Through the registry
0By email
0By mail
0