Ridgeline Farms Inc. - Environmental Compliance Approval (waste)

Instrument type: Environmental Compliance Approval (waste)

ERO number
026-0527
Ministry reference number
0746-DTKP8H
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
May 25, 2026 - July 9, 2026 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
July 9, 2026

Proposal summary

This proposal is for a new Environmental Compliance Approval (Waste Disposal Site) to be issued to Ridgeline Farms Inc. for a processing facility located in Centre Hastings, Ontario.

Location details

Site address

1535 Ridge Road
Centre Hastings, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Ridgeline Farms Inc.
1535 Ridge Road
Centre Hastings, ON
K0K 3E0
Canada

Proposal details

This proposal is for an Environmental Compliance Approval for a waste disposal site (processing) for receipt and pre-processing of organic off-farm wastes and processing (anaerobic digestion) of the off-farm wastes with agricultural source materials for production of soil supplements, animal bedding materials, and biogas.

The approval is being sought to expand the existing facility regulated under the Nutrient Management Act consisting of:

  • one solids storage bunker and feeder,
  • three off-farm waste receiving/pre-storage tanks (holding capacity of 160 cubic metres for two, and 30 cubic metres for one),
  • one pasteurization tank (holding capacity 1,500 cubic metres),
  • two regulated mix anaerobic digesters (holding capacity of 5,000 cubic metres and 1,500 cubic metres),
  • two CHP generation units,
  • biogas conditioning equipment, and
  • one waste gas flare

The digesters and the associated equipment and structures have been built in compliance with all applicable regulatory requirements at the time of construction.

The total area of the proposed waste disposal site is 1.31 hectares located in Centre Hastings. The site will receive a maximum of 200 cubic metres of liquid waste per day or 200 tonnes of non-hazardous solid waste per day with an annual maximum of 25,000 cubic metres of liquid waste or tonnes non-hazardous solid waste. This is an increase of the annual amount of off-farm waste from 15,000 to 25,000 cubic metres/tonnes.

This off-farm waste will then be mixed with the agricultural source materials in the existing mixed anaerobic digesters. Generated biogas will be upgraded into renewable natural gas prior to its injection into a natural gas pipeline as well as burned in the two CHP generation units. The total amount of off-farm waste stored at the site is not to exceed 200 cubic metres or 200 tonnes at any one time.

Receiving hours of operation are 7 a.m. to 7 p.m., 6 days a week, and the processing will occur 24 hours a day, 7 days per week. The waste disposal site serves the Province of Ontario.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice