Sherwin-Williams Canada Inc. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
026-0695
Ministry reference number
0803-DV5LCN
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
July 10, 2026 - August 24, 2026 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
August 24, 2026

Proposal summary

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 9173-9Z9JYL for Sherwin-Williams Canada Inc., a powder coatings for a variety of industrial and commercial surface coating applications manufacturing facility located in Grimsby, Ontario.

Location details

Site address

13 Iroquois Trail
Grimsby, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Sherwin-Williams Canada Inc.
13 Iroquois Trail
Grimsby, ON
L3M 5E6
Canada

Proposal details

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 9173-9Z9JYL for Sherwin-Williams Canada Inc., a powder coatings for a variety of industrial and commercial surface coating applications manufacturing facility located in Grimsby, Ontario.

The emission sources from the manufacturing and associated processes that discharge to the air include:

  • batch mixing
  • blending and welding operations
  • powders baking
  • powders grinding
  • packaging
  • raw materials and finish products storage, and
  • handling operations

Emissions to the atmosphere from this facility include:

  • benzene
  • aluminum hydroxide
  • acrylic polymer
  • amorphous silica, and
  • nitrogen oxides

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice