Goulet Septic Pumping and Design Ltd. - Environmental Compliance Approval (waste)

Instrument type: Environmental Compliance Approval (waste)

ERO number
026-0765
Ministry reference number
1694-DUJJ5L
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
July 22, 2026 - September 5, 2026 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
September 5, 2026

Proposal summary

This proposal is for a new Environmental Compliance Approval for a hauled sewage disposal site for storage and treatment in South Glengarry, Ontario.

Location details

Site address

4074 1st Line Road
South Glengarry , ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Goulet Septic Pumping and Design Ltd.
18007 Headline Road
South Stormont, ON
K0C 1P0
Canada

Proposal details

Hauled sewage, commonly known as septage, is the waste material removed from portable toilets, sewage holding tanks and septic systems. Untreated hauled sewage from holding tanks and septic tanks may be disposed of on land in accordance with an Environmental Compliance Approval (ECA) issued under the Environmental Protection Act (EPA).

This proposal is for the issuance of an Environmental Compliance Approval for a hauled sewage disposal site.

Other information:

Site Details

  • Application type: new
  • Total useable area: 17.3 hectares
  • Type of disposal: storage and treatment
  • Number of lagoons: 1 lagoon and a reed filter bed system

Highlights of Proposed Approval Requirements

  • Prior to operating at the Site, the Company shall develop written procedures covering the following:
    • procedures for reporting to the Ministry, and municipal authorities as required in the event a spill occurs at the Site
    • a list of the personnel responsible for operations at the Site
  • The Company shall ensure that all personnel involved in the operation of this Hauled Sewage Disposal Site are aware of the requirements of this Approval and are trained in Spill Prevention
  • Spills of a pollutant that cause or may cause an adverse effect are to be reported to the Ministry's Spills Action Centre and the Company shall take appropriate remedial action to limit the impact
  • The Company must ensure that no unnecessary off-Site effects, such as vermin, vectors, odour, dust, litter, noise or traffic, result from the operation of this Site
  • Written records must be maintained in a log book that documents daily operations as well as any spills that occur and any complaints received
  • 10,000 cubic metres of hauled sewage (Residential Septic tank waste, commercial septic tank waste, residential holding tank waste and commercial holding tank waste) proposed to be stored at this site
  • Hauled sewage will be stored in a 10,000 m³ lined lagoon storage cell (90 metres x 45 metres)
  • The storage must be designed and constructed according to specified standards set out in the approval
  • The storage must be operated in accordance with specified standards set out in the approval including minimum freeboard requirements
  • Surface or ground water monitoring is required under the ECA
  • Financial Assurance may be required for the storage of hauled sewage

Other

Prior to the spreading of hauled sewage, the operator is responsible for ensuring that all necessary approvals, licences or permits that may be required from other authorities, such as the local municipality, conservation authority, MNR and OMAFA, have been acquired.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice