Aevitas Inc. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
026-0835
Ministry reference number
6797-DMXMLS
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
August 7, 2026 - September 21, 2026 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
September 21, 2026

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) from Aevitas Inc., a waste processing facility, located in Ayr, Township of North Dumfries, Ontario.

Location details

Site address

75 Wanless Court
North Dumfries, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Aevitas Inc.
75 Wanless Court
North Dumfries, ON
N0B 1E0
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Aevitas Inc., a waste processing facility, located in Ayr, Township of North Dumfries, Ontario.

The application includes all sources at the facility, including two fluorescent lamp crushing lines, a retort oven, a solvent and inorganic repackaging process, a laboratory, and a lead washing station.

Emissions to the air from this facility include:

  • mercury
  • ethylbenzene
  • xylenes
  • mineral spirits
  • isopropyl alcohol
  • acetone
  • hydrochloric acid, and
  • dichloromethane

The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice