This notice is for informational purposes only. There is no requirement to consult on this initiative on the Environmental Registry of Ontario. Learn more about the types of notices on the registry.
Why consultation isn't required
The purpose of the posting is to inform the general public of the amendment and their right to require a hearing in respect of this decision.
We consider that the potential effect of the amendment on the environment to be insignificant.
Bulletin details
The Renewable Energy Approval for the Goulais Wind Farm Project has been amended. This is a project design change to allow the increase of the nameplate capacity of eleven (11) wind turbines from 2.3 megawatts (MW) to 2.5 MW. The project’s overall nameplate capacity of 25 MW will remain the same. The ministry also updated the name of the company to reflect changes to their corporate structure.
The ministry has also removed conditions that are no longer applicable and updated others, as appropriate, to reflect the project's current operations.
The ministry has reviewed the Noise Impact Assessment Report completed for the amendment. The facility must comply with the noise limits set out in O. Reg. 359/09 under the Environmental Protection Act and the 2016 Noise Guidelines for Wind Farms.
No physical changes will be made to the turbines. No adverse environmental effects are expected. The facility is expected to continue to comply with ministry noise limits.
This Class 4 wind facility is located in the unorganized township of Pennefather, District of Algoma (north of Sault Ste. Marie).
Third-party hearing provisions
Any resident of Ontario may require a hearing by the Ontario Land Tribunal (OLT) within 15 days after the date this decision is loaded to the Environmental Registry by written notice served upon all of the following:
Appellate body
Courier mail should be addressed to:
Ontario Land Tribunal
25 Grosvenor Street, 4th Floor
Toronto, Ontario, M7A 1R1
Mail sent through Canada Post should be addressed to:
Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario, M5G 1E5
Phone: 416-212-6349
Toll free: 1-866-448-2248
TTY: 1-800-855-1155
Email: OLT.Registrar@ontario.ca
Issuing authority
Neryed Ragbar, P.Eng.
Director, Section 47.5, Environmental Protection Act
Environmental Permissions Branch
40 St. Clair Avenue West
Toronto, Ontario, M4V 1M2
Phone: (437) 216-7610
Toll-Free Phone: (800) 461-6290
Email: enviropermissions@ontario.ca
Proponent
Chi-Wiikwedong GP Inc. as general partner for and on behalf of Chi-Wiikwedong Holdings LP as general partner for and behalf of Chi-Wiikwedong LP
Patrick Leitch, Chief Operating Officer
Suite 2930, 155 Wellington Street West Toronto, Ontario, M5V 3H1
Toronto, Ontario, M5V 3H1
Email: pleitch@capstoneinfra.com
An applicant for a hearing shall state in the notice requiring the hearing:
- A description of how engaging in the renewable energy project in accordance with the renewable energy approval will cause either:
- serious harm to human health
- serious and irreversible harm to plant life, animal life or the natural environment
- The portion of the renewable energy approval in respect of which the hearing is required.
- The relief sought.
Further information is provided on the OLT’s website at: https://olt.gov.on.ca/.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Connect with us
Contact
Nick Colella
135 St Clair Avenue West
1st floor
Toronto ,
ON
M4V1P5
Canada