This consultation closes at 11:59 p.m. on:
October 4, 2026
Proposal summary
This proposal is for a renewal to Permit to Take Water No. 6127-AGSJRC for G. TACKABERRY & SONS CONSTRUCTION COMPANY LIMITED. Water will be taken from one pond for aggregate extraction dewatering, aggregate washing, dust suppression and construction spraying purposes in Rideau Lakes, Ontario.
Location details
Site address
580c County Road 5
Rideau Lakes,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
G. TACKABERRY & SONS CONSTRUCTION COMPANY LIMITED
109 Washburn Road
Athens,
ON
K0E1B0
Canada
Proposal details
This proposal is for a renewal to Permit to Take Water No. 6127-AGSJRC for G. TACKABERRY & SONS CONSTRUCTION COMPANY LIMITED. Water will be taken from one pond for aggregate extraction dewatering, aggregate washing, dust suppression and construction spraying purposes in Rideau Lakes, Ontario. Details of the water taking are as follows:
Application type - Renewal
Source name: Quarry Sump (upper rate)
- purpose: aggregate extraction, dewatering
- maximum rate per minute (litres): 8,280
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 11,923,200
- maximum number of days of taking per year: 120
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source name: Quarry Sump (lower rate)
- purpose: aggregate extraction, dewatering
- maximum rate per minute (litres): 8,280
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 5,961,600
- maximum number of days of taking per year: 245
- earliest calendar date of taking mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source name: Quarry Sump (aggregate washing)
- purpose of water taking: aggregate washing
- maximum rate per minute (litres): 8,280
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 5,961,600
- maximum number of days of taking per year: 292
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source name: Quarry Sump (dust suppression)
- purpose of water taking: construction, dust suppression
- maximum rate per minute (litres): 1,500
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 1,080,000
- maximum number of days of taking per year: 292
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source name: Quarry Sump (construction)
- purpose of water taking: construction, spraying
- maximum rate per minute (litres): 1,500
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 1,080,000
- maximum number of days of taking per year: 292
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
There are three categories of Permit to Take Water application:
- Category 1 applications are considered low-risk and are unlikely to pose unacceptable impacts
- Category 2 applications require a Qualified Person to undertake a scoped scientific evaluation to ensure the withdrawal of water does not result in unacceptable impacts or interference with other users. The evaluation should also demonstrate that the taking meets one of the Category 2 criteria
- Category 3 applications must submit a detailed hydrogeological study and/or surface water study prepared by a Qualified Person for ministry review. The study will evaluate the potential for unacceptable impacts resulting from the water taking
According to the application criteria presented in the Permit to Take Water application guide, the proposed water taking qualifies as a Category 3 application. Any proposals for groundwater or surface water takings that do not meet the Category 1 or Category 2 application criteria are considered to be Category 3 applications.
For more information, refer to the Permit to Take Water application guide using the website link below: Guide to Permit to take water application form | ontario.ca
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Connect with us
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto,
ON
M4V 1M2
Canada
Comment
Let us know what you think of our proposal.
Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.Read our commenting and privacy policies.
Submit online
Submit by mail
Contact
Client Services and Permissions Branch
40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada