Discovery Kidd Creek Inc. - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
026-1161
Ministry reference number
1000480240
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
November 12, 2026 - December 27, 2026 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
December 27, 2026

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air and noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Discovery Kidd Creek Inc.

Location details

Site address

11335 Highway 655 North
Timmins, Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Discovery Kidd Creek Inc.
10050 Highway 101 East
P.O. Box: 2002
Timmins, ON
P4N 7K1
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air and noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from Discovery Kidd Creek Inc., a mining and mineral processing facility producing copper-zinc ore located in Timmins, Ontario.

The application includes all sources at the facility, including combustion equipment, dust collectors, welding operations, cooling towers, ventilation raises, fugitive roadway emissions, material handling emissions, and wind erosion.

Emissions to the air from this facility include:

  • particulate aatter
  • nitrogen oxides
  • sulphur dioxide
  • manganese, lead
  • cadmium
  • chromium (VI)

The Environmental Compliance Approval with Limited Operational Flexibility (air and noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air and noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

40 St. Clair Avenue West
Floor 2
Toronto, ON
M4V 1M2
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Share

Email

Facebook

X

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice