Update Announcement
This proposal notice was updated on September 3rd, 2024 to advise the public that this file is still under active review. The original proposal date and comment period have not been altered.
This consultation was open from:
June 16, 2023
to July 31, 2023
Proposal summary
This proposal is for the renewal of the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) 1223-9CPRC6 for Panolam Industries Ltd., a particle board and miscellaneous wood products manufacturing facility, located at 61 Domtar Road, in Huntsville, Ontario.
Location details
Site address
61 Domtar Road
Huntsville,
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Panolam Industries Ltd.
61 Domtar Road
Huntsville,
ON
P1H 2J7
Canada
Proposal details
This proposal is for the renewal of the Limited Operational Flexibility for Environmental Compliance Approval (air & noise) 1223-9CPRC6 for Panolam Industries Ltd., a particle board and miscellaneous wood products manufacturing facility, located at 61 Domtar Road, in Huntsville, Ontario.
The emission sources from the manufacturing and associated processes that exhaust to the air include a wood waste combustor, baghouse dust collectors serving refining and drying, blending and pressing, sawdust conveying, saw and sander system and raw material storage, and exhaust from formaldehyde kettle, board cooler, welding operation, chemical dispensing area, assembly and painting operations, maintenance activities and non-process sources of combustion.
Emissions to the air from this facility include:
- volatile organic compounds
- particulate matter
- sulphur dioxide
- acrolein
- formaldehyde
- nitrogen oxides
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from June 16, 2023
to July 31, 2023