This consultation was open from:
November 30, 2023
to December 30, 2023
Proposal summary
This proposal is for the renewal of Permit to Take Water No. 4025-96ZH2P for the purpose of golf course irrigation for The North Bay Golf and Country Club, Limited.
Location details
Site address
100 Tupper Drive
North Bay,
ON
Canada
Site location details
Lot 18, Concession A
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
The North Bay Golf and Country Club, Limited
100 Tupper Drive
North Bay,
ON
P1B 8K1
Canada
Proposal details
This proposal is for the renewal of Permit to Take Water No. 4025-96ZH2P for the purpose of golf course irrigation for The North Bay Golf and Country Club, Limited. Water will be taken from one well, one pond and one watercourse. Details of the water taking are as follows:
Permit type: Renewal
Source name: TW1-09 (well)
- purpose: golf course irrigation
- maximum rate per minute (litres): 228
- maximum number of hours of taking per day: 24
- maximum volume of taking per day (litres): 328,320
- maximum number of days of taking in a year: 214
- period of taking: April 1 to October 31 for 10 years
Source name: Golf Course Tributary (watercourse)
- purpose: golf course irrigation
- maximum rate per minute (litres): 1,692
- maximum number of hours of taking per day: 24
- maximum volume of taking per day (litres): 2,436,480
- maximum number of days of taking in a year: 214
- period of taking: April 1 to October 31 for 10 years
Source name: Irrigation Pond
- purpose: golf course irrigation
- maximum rate per minute (litres): 3,788
- maximum number of hours of taking per day: 12
- maximum volume of taking per day (litres): 1,136,363
- maximum number of days of taking in a year: 214
- period of taking: April 1 to October 31 for 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from November 30, 2023
to December 30, 2023