Update Announcement
This proposal notice was updated on November 5th, 2024 for 7 days to give interested parties additional time to submit their comments.
This consultation was open from:
September 16, 2024
to November 12, 2024
Proposal summary
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0312-9NVJDB for Accuride Canada Inc., a light and heavy truck wheel production facility located in the City of London, Ontario.
Location details
Site address
31 Firestone Boulevard
London,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Accuride Canada Inc.
31 Firestone Boulevard
London,
ON
N5W 6E6
Canada
Proposal details
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 0312-9NVJDB for Accuride Canada Inc., a light and heavy truck wheel production facility located in the City of London, Ontario.
The emission sources from the manufacturing and associated processes that discharge to the air include natural gas combustion equipment, propane combustion equipment, cooling towers, welding, parts washers/rinse, powder coating, electrocoating, surface treatment before electrocoating, plasma cutting torch, disc machining processes, and spray painting processes.
The amendment includes renewing the Limited Operational Flexibility and removing the Regenerative Thermal Oxidizer (RTO) from the facility. Emissions to the air from this facility include:
- chromium (VI),
- manganese,
- nickel,
- nitrogen oxides,
- particulate matter,
- sodium hydroxide, and
- noise.
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from September 16, 2024
to November 12, 2024