This consultation closes at 11:59 p.m. on:
March 28, 2025
Proposal summary
GROWMARK INC. requested permission to delay upgrading underground fuel piping with Electronic Line Leak Detection for up to two years (by February 2027).
Location details
Site address
2875 HWY 6
LIONS HEAD,
ON
N0H 1W0
Canada
Site location details
Bulk Plant and Cardlock
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
GROWMARK INC
105 Silvercreek Pkwy N, Unit 200
Guelph,
ON
N1H 6S4
Canada
Proposal details
Liquid Fuels Handling Code (LFHC) Requirements that Would Not be Met:
4.5.1.3. (a) Double-wall underground pressure piping systems that were installed prior to
January 1, 2006, and were approved to one of the following standards
- ULC/ORD-C107.4-1992, Ducted Flexible Underground Piping System for Flammable and Combustible Liquids;
- ULC/ORD-C107.7-1993, Glass-Fibre Reinforced Plastic Pipe and Fittings for Flammable and Combustible Liquids; or
- ULC/ORD-C107.19-1992, Secondary Containment of Underground Piping for Flammable and Combustible Liquids
shall be upgraded with Electronic Line Leak Detection (ELLD) within three years of the effective date of this code.
- If the certification for the pipe is undetermined, the piping shall be upgraded in accordance with (a).
- The ELLD shall be programmed to run the 0.76 L/h test every month and the 0.38 L/h test annually and it shall shut down the submersible turbine pump when a leak is detected. (See Table 5)
Director’s Order FS-250-20
Due to the consequences that COVID-19 (a new development) has had on the fuels industry, including the economic impacts, the impacts from the requirements of social distancing and the impacts from the closing of non-essential businesses, the Director has recognized the challenges industry owners may have in obtaining compliance with the upgrade requirements by October 1, 2020.
Therefore, pursuant to his authority undersection 36(3)(a) of the Technical Standards and Safety Act, 2000, the Director, in order to accommodate the new development of COVID-19, temporarily authorizes the following change to clause 4.5.1.3. of the Liquid Fuels Handling Code (LFHC) 2017: the deadline for compliance with the upgrade requirements is extended from “three years of the effective date of this code” by an additional one year and shall hereafter be read “four years of the effective date of this code”; the compliance deadline is therefore extended to October 1, 2021, effective immediately.
Why the Code Would Not be Met
The entire site including piping is scheduled to be upgraded within two years.
Safety Assessment
Tanks and piping at this site are tested for leaks every two years using Precision Leak Testing methods. The last testing was completed in October 2024 with passing result.
TSSA assesses that there is likely to be no environmental impact should this variance be granted.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
345 Carlingview Drive
Toronto,
ON
M9W 6N9
Canada
Connect with us
Contact
Marek Kulik
345 Carlingview Drive
Toronto,
ON
M9W 6N9
Canada
Comment
Let us know what you think of our proposal.
Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.Read our commenting and privacy policies.
Submit online
Submit by mail
Contact
Marek Kulik
345 Carlingview Drive
Toronto, ON
M9W 6N9
Canada