2311215 Ontario Limited and 2311217 Ontario Limited - Environmental Compliance Approval (sewage)

Instrument type: Environmental Compliance Approval (sewage)

ERO number
025-0298
Ministry reference number
2071-DDHE6F
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
March 21, 2025 - May 5, 2025 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
May 5, 2025

Proposal summary

This proposal is for a new Environmental Compliance Approval (sewage) to be issued to 2311215 Ontario Limited and 2311217 Ontario Limited, for the establishment of sewage works, in support of a proposed expansion of the existing multi-unit storage facility; for the collection stormwater run-off from a site located at 4155 Road 38, in Harrowsmith.

Location details

Site address

4155 Road 38
Township of South Frontenac, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

2311215 Ontario Limited and 2311217 Ontario Limited
4153 Road 38
South Frontenac, ON
K0H 1V0
Canada

Proposal details

This proposal is for a new Environmental Compliance Approval (sewage) to be issued to 2311215 Ontario Limited and 2311217 Ontario Limited, for the establishment of sewage works, in support of a proposed expansion of the existing multi-unit storage facility; for the collection, transmission, treatment and disposal of stormwater run-off from a site located at 4155 Road 38, in Harrowsmith, Township of South Frontenac, Ontario.

The sewage works system will consist of a wet pond, complete with storm sewers, and ditches designed for quantity control; discharging into the Millhaven Creek Watershed, via a Road ditch. The end of pipe discharge from the pipe networks onsite will be treated with rip-rap to aid in reducing erosion and scouring of the pond base. The pond overflow outlet will also utilize rip-rap to aid in reducing erosion of the swale and pond berms. An Oil and Grit Separator unit will be installed downstream of the pond for quality control.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice