September 2, 2021 - October 2, 2021 (30 days) Closed
Last updated
A new Permit to Take Water No. 2385-C94V8N that renews and consolidates Permits to Take Water Nos. 1406-B6ASWR and 2684-B7CJMF for Enbridge Pipelines Inc. was issued on December 16, 2021 for construction dewatering purposes for a project located at City of Hamilton, Ontario.
August 25, 2022 - October 9, 2022 (45 days) Closed
Last updated
An amendment has been made to the renewable energy approval for the Grimsby Anaerobic Digestion Site located at 424 Sobye Road in Grimsby in the Regional Municipality of Niagara. The amendment will allow the facility to accept new waste types and increased waste tonnage, and to build new infrastructure on site.
We have issued Certificate of Property Use No. 4810-B8BR8A for 177, 183, 197 Front Street East and 15 and 21 Lower Sherbourne Avenue, Toronto to Sentinel (Sherbourne) Land Corporation, as part of their development plans for the site.
December 10, 2018 - January 24, 2019 (45 days) Closed
Last updated
We have approved amended Environmental Compliance Approval (Air & Noise) No. 4126-ABJGQE for London District Energy GP Inc., as general partner for, and on behalf of, London District Energy LP., for a steam and energy plant in London, Ontario.
The ministry has accepted a risk assessment prepared for the owner as part of their future development plans for a property at 158 and 160 Spruce Street, Ottawa. The director is considering issuing a Certificate of Property Use.
Instrument type:
Permit for activities to achieve an overall benefit to a species
ERO number
019-5679
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
August 11, 2022 - September 10, 2022 (30 days) Closed
Last updated
The Minister of the Environment, Conservation and Parks has issued an overall benefit permit to the City of Niagara Falls for a bridge replacement that may impact American Water-willow, a species at risk plant. The permit includes actions to minimize adverse effects and benefit the species, and monitoring and reporting requirements.
August 4, 2021 - September 18, 2021 (45 days) Closed
Last updated
We have issued an amended Environmental Compliance Approval No. A022108 to Environmental Services Inc. (ESI) allowing capacity increase for a temporary storage of biosolids from 500 to 1500 tonnes, subject to the submission and approval of an odour management plan by the director.
A new Environmental Compliance Approval (air & noise) has been granted to Stubbe's Redi-Mix Inc., a ready-mix concrete plant and precast plant, located at 44 Muir Line, Harley Township, Ontario.
January 28, 2020 - February 27, 2020 (30 days) Closed
Last updated
Certificate of Property Use (CPU) No. 0554-BJRHS6 for 5200 Yonge Street, Toronto was issued to 5200 Yonge G.P. Inc. and 5200 Yonge Limited Partnership, as part of their development plans for the site.
Instrument type:
Approval to register for a technical standard for air pollution (industry standard)
ERO number
019-6359
Notice type
Instrument
Notice stage
ProposalUpdated
Proposal posted
Comment period
March 23, 2023 - May 7, 2023 (45 days) Closed
Last updated
This proposal is for C. Valley Asphalt Inc., located in Woodbridge, Ontario, to be registered under the Technical Standards Registry – Air Pollution. This facility will adhere to all technical and operational requirements in the Asphalt Mix – Industry Standard under the Local Air Quality Regulation (O. Reg. 419/05).
Instrument type:
Approval to register for a technical standard for air pollution (industry standard)
ERO number
019-6358
Notice type
Instrument
Notice stage
DecisionUpdated
Decision posted
Proposal posted
Comment period
March 23, 2023 - May 7, 2023 (45 days) Closed
Last updated
We have granted approval to D. Crupi & Sons Limited located in Toronto, Ontario, to be registered under the Technical Standards Registry – Air Pollution. This facility will adhere to all technical and operational requirements in the Asphalt Mix – Industry Standard under the Local Air Quality Regulation (O. Reg. 419/05).
Approval was granted for a new Environmental Compliance Approval (air & noise) for J. Harrison Excavating and Pipeline Ltd. for the operation of a mobile crushing plant, equipped with one crusher, a front end loader, a conveyor, and associated diesel engines.
November 1, 2018 - December 16, 2018 (45 days) Closed
Last updated
An Environmental Compliance Approval with Limited Operational Flexibility (Air & Noise) which replaces all the current Environmental Compliance Approvals for Air and Noise at this facility and includes the addition of new or historically unapproved sources for all emissions has been granted to Ryding-Regency Meat Packers Ltd., a slaughterhouse.
December 4, 2020 - January 18, 2021 (45 days) Closed
Last updated
Certificate of Property Use (CPU) No. 3813-BGQJE5 for 250 Lawrence Avenue West and 219 Glengarry Avenue, Toronto was issued to Graywood 250 GP Inc. as part of their development plans for the site.
We amended Renewable Energy Approval No. 4353-9HMP2R for the Niagara Region Wind Farm, located in the Townships of West Lincoln, Wainfleet and the Town of Lincoln within the Region of Niagara and Haldimand County. The amendment is to outline daytime and nighttime operation requirements for wind turbine T08.
A Certificate of Property Use was issued to Hughson Business Space (Water St.) Corporation for the property located at 73 Water Street North in the City of Cambridge.