September 9, 2022 - October 24, 2022 (45 days) Closed
Last updated
The ministry has issued a new Environmental Compliance Approval (industrial sewage) to Costco Wholesale Canada Ltd., for the establishment of stormwater management works servicing a proposed gas bar, retail warehouse and parts of a parking lot located at 84 Lynden Road, in Brantford, Ontario.
September 7, 2022 - October 22, 2022 (45 days) Closed
Last updated
Pave-Al Limited requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn, and no approval was issued.
September 7, 2022 - October 22, 2022 (45 days) Closed
Last updated
The original application for a subsurface disposal system was withdrawn by the applicant and a new application was submitted for the usage of temporary sewage holding tanks under a new ministry application Reference No. 0418-CTFKY8. The ministry issued Environmental Compliance Approval No. 9427-CTQPWV for the temporary sewage holding tanks.
A new Environmental Compliance Approval (Sewage) was granted to River Street Development Corporation, for the establishment of a stormwater management works structure.
January 28, 2022 - March 14, 2022 (45 days) Closed
Last updated
Approval is granted for a new Environmental Compliance Approval (sewage) for Handy Bros. Home Comfort Inc. for stormwater management works serving a new building addition, located at 5 Classic Car Drive in the Municipality of Chatham-Kent, Ontario.
January 11, 2022 - February 25, 2022 (45 days) Closed
Last updated
A new Environmental Compliance Approval (sewage) was issued for the establishment of subsurface disposal works to service a seasonal trailer park, located at 26158 Kerwood Road in Strathroy, Ontario.
January 6, 2022 - February 20, 2022 (45 days) Closed
Last updated
Approval of sewage works for the collection, transmission, treatment and disposal of stormwater at the 3.965 ha site including the existing tank farms area, parking areas and facilities including an industrial building with associated parking areas, for quality control to enhanced and quantity control to predevelopment level.
January 6, 2022 - February 20, 2022 (45 days) Closed
Last updated
An Environmental Compliance Approval was granted for the modification of sewage works for the collection, transmission, and discharge of stormwater at the Crowland Transmission Station, located at 50 Humberstone Road, in the City of Welland, Regional Municipality of Niagara.
February 24, 2022 - April 10, 2022 (45 days) Closed
Last updated
A new Environmental Compliance Approval has been issued for municipal and private storm sewers and stormwater management works serving Jerosa Holdings Company Ltd., located in St. Clements consisting of an oversized storm sewer and oil grit separator discharging to Martin Creek.
Approval for the establishment of sewage Works for the treatment and subsurface disposal of domestic sewage, rated at a maximum design capacity of 15,950 litres per day, to service a seasonal cottage facility with 26 trailers and 8 cabins, and a central comfort station with 5 septic tanks, one balancing tank and proprietary treatment system.
January 26, 2022 - March 12, 2022 (45 days) Closed
Last updated
We have issued a new Environmental Compliance Approval (M&P sewage) for expanded stormwater management works and subsurface sewage disposal works servicing a retirement residence located at 30 Florapine Road, in the Town of Floradale, Ontario.
February 17, 2022 - April 3, 2022 (45 days) Closed
Last updated
Approval for sewage Works for the collection, holding and disposal of domestic sewage from a three (3) bedroom two story dwelling on an approximately 230 m2 lot, having the holding tank / septic tank located on the owner's separate lot located on the other side of the road.
February 11, 2022 - March 28, 2022 (45 days) Closed
Last updated
This ministry has issued a new Environmental Compliance Approval (sewage) to Halo Car Wash Inc. for stormwater management works serving a new Halo Car Wash site, located at 250 Southdale Road East in the City of London, County of Middlesex, Ontario.
A new Environmental Compliance Approval for 2722746 Ontario Inc. has been issued for the replacement of the existing subsurface sewage disposal works, servicing a seasonal trailer campground at Head Lake RV Resort, located at 2412 Monck Road in the City of Kawartha Lakes, Ontario.
GFL requested to withdraw the application for an Environmental Compliance Approval (sewage). The application is considered withdrawn and no approval was issued.
A new Environmental Compliance Approval was granted to PDCP Block 5 Industrial GP Inc., as a general partner for and on behalf of PDCP Block 5 Industrial Limited Partnership, for industrial stormwater management works serving a proposed industrial development, located at 120 Bullock Street in the City of Kitchener, Ontario.
We have issued an Environmental Compliance Approval (sewage) to Humber River Hospital for the approval of storm sewers and a stormwater management facility to be constructed at 2109 Finch Avenue West, in the City of Toronto, Ontario.
An amended Environmental Compliance Approval has been issued to Lafarge Canada Inc. for the sewage works serving the Lafarge Bath Plant, located at 6501 Bath Road in Bath, Ontario.
Approval was issued to establish stormwater management works for the treatment and disposal of stormwater run-off from a catchment area of 1.068 ha. site with office buildings, one maintenance building and parking areas, to provide normal (70 % TSS removal) level of water quality protection of the surface run-off prior to discharge into Baby Creek.
July 23, 2021 - September 6, 2021 (45 days) Closed
Last updated
We have issued an Environmental Compliance Approval (sewage) to Eva Lillian McCurry for the establishment of works for the treatment and subsurface disposal of domestic sewage, with a daily sanitary design flow of 47,200 litres per day, to service the year-round Root River Trailer Court located at 103 Old Highway 17 North, City of Sault Ste. Marie.