A renewal of Environmental Compliance Approval with Limited Operational Flexibility (air & noise) was granted to Bruce Power Inc, a nuclear power plant located near Tiverton, Ontario.
The facility production limit is 7,200 megawatts of electricity.
An Environmental Compliance Approval (air and noise) with operational flexibility was issued for Opta Inc., a manufacturing facility producing carbide and magnesium-based powders and mixtures located in Norfolk County, Ontario.
July 20, 2021 - September 3, 2021 (45 days) Closed
Last updated
An Environmental Compliance Approval with limited operational flexibility has been issued to all sources of air emissions from the Grakon Hamsar Holdings Ltd. facility located at 5320 Downey Street in Burlington.
September 13, 2023 - October 28, 2023 (45 days) Closed
Last updated
An amendment to Environmental Compliance Approval (air and noise) No. 4145-CGQMPY with Limited Operational Flexibility was issued to Kirkland Lake Gold Ltd. for the emissions from the Macassa Mine site, located in Town of Kirkland Lake, Ontario.
We are providing general notice to the public that we require additional time to prepare the management plan for Eastern Migratory Caribou under the Endangered Species Act, 2007.
Instrument type:
Approval for a consent (subject to conditions) in an area where there is no official plan in place
ERO number
019-8064
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
January 23, 2024 - February 22, 2024 (30 days) Closed
Last updated
Pursuant to Section 53 of the Planning Act, provisional consent to create one new lot for resource-based recreational uses, together with an easement in favor of the new lot of, was granted on March 7, 2024, subject to conditions.
February 6, 2024 - March 22, 2024 (45 days) Closed
Last updated
On March 25, 2024, the director issued an order under section 136 of the Environmental Protection Act to the Parties. The order authorizes the Crown to use financial assurance for the performance of environmental measures including the preparation of a delineation plan to better understand the nature and extent of contamination on the site.
Instrument type:
Approval for a consent (subject to conditions) in an area where there is no official plan in place
ERO number
019-6864
Notice type
Instrument
Notice stage
Decision
Decision posted
Proposal posted
Comment period
March 31, 2023 - April 30, 2023 (30 days) Closed
Last updated
Application for Consent, 60-C-222103 to re-establish a rural agricultural parcel was granted provisional approval on June 14, 2023. The last day to appeal this decision is July 4, 2023.
August 26, 2024 - October 10, 2024 (45 days) Closed
Last updated
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air) for 7974906 Canada Inc., operating as Alumicast Technologies, a manufacturer of various products and parts through die casting of aluminum and zinc alloys, located at 705 Bayview Drive in the City of Barrie, Ontario.
November 17, 2023 - January 1, 2024 (45 days) Closed
Last updated
An approval was issued to amend Environmental Compliance Approval (air & noise) No. 3970-9HZNXY for the renewal of the Operational Flexibility conditions for PPG Architectural Coatings Canada, Inc., a paint manufacturing facility located at 8200 Keele Street in Concord, Ontario.
This is for an Environmental Compliance Approval with Limited Operational Flexibility (air) for Molten Metallurgy Inc., a steel and iron castings manufacturing facility located in Paris, Ontario.
The Ministry of the Environment, Conservation and Parks has released the Minister’s Annual Report on Lake Simcoe for 2023. This report summarizes measures taken in 2023 to implement the Lake Simcoe Protection Plan, as required under Section 12 (1) of the Lake Simcoe Protection Act.
Approval has been granted for an amendment to Environmental Compliance Approval (air & noise) No. 2892-ARTN8J with Limited Operational Flexibility for Thunder Bay Pulp and Paper Inc. (formerly Resolute FP Canada Inc.), a kraft market pulp and paper products manufacturing facility located in the City of Thunder Bay, Ontario.
January 31, 2023 - March 17, 2023 (45 days) Closed
Last updated
This approval is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) 7334-9FVMDY for Protec Finishing Ltd., an automotive parts finishing facility, located in the Mississauga, Ontario.
This proposal is for the renewal of Permit to Take Water No. 8404-7YBLB2 for Robins Holdings Inc. and is for commercial purposes including water bottling. The new issued permit No. 0022-CL9PPA was issued on November 17, 2022, with an expiry date of November 17, 2032.