For rural residents where the cost of replacing existing infrastructure exceeds or is close to the cost of installing energy infrastructure at the customers site, the Hydro One infrastructure should be phased out and stand alone green/ hybrid energy production should be subsidized at the customers site.  This would be cost effective and more reliable, particularly where rural distribution lines are of considerable length.