The volume of materials…

Comment

The volume of materials being proposed to be accepted at this site with the incredible increase of truck traffic and the ability to operate 24-7 is completely irresponsible considering the extremely close proximity to town. This will be disruptive to the entire town and threatens the safety of the children that attend 2 schools right on the route to the proposed site.