Cette consultation a eu lieu :
du 29 novembre 2023
au 29 décembre 2023
Résumé de la décision
Certificate of Property Use No. 6542-CXZNXT for 955 Lake Shore Blvd. West (Ontario Place – West Island), Toronto, was issued to 'His Majesty the King in Right of Ontario as Represented by the Minister of Infrastructure', as part of their development plans for the site.
Détails de l'emplacement
Adresse du site
955 Lake Shore Blvd. West
Toronto,
ON
M6K 3B9
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
His Majesty the King in Right of Ontario as Represented by the Minister of Infrastructure
1 Dundas Street West
Suite 2000
Toronto,
ON
M5G 2L5
Canada
Détails de la décision
Certificate of Property Use (CPU) No. 6542-CXZNXT was issued that requires the owner to ensure that the following key measures are undertaken:
- building construction restrictions
- property use restrictions
- barriers to site soils
- inspection and maintenance program of barriers to site soils
- soil and groundwater management plan
- site specific heath and safety plan for workers
- air monitoring requirements; and
- reporting requirements
Section 197 Order is included and requires that a certificate be registered on the property title in accordance with section 197 of the Act, and that before dealing with the property in any way, a copy of the CPU must be given to any person who will acquire an interest in the property.
A copy of the final CPU, including the section 197 Order, is provided as a link under the supporting materials section of this notice.
Effets de la consultation
The Director reviewed the one public comment received by email and decided that no changes to the CPU were required to address this public comment as it did not comment on the draft CPU, but was related to the enhance public consultation regarding the ERO posting
The Director did make changes to the CPU, after consultation with the proponent, to provide for clarification and correction to the following sections:
Legal description contained in the Site section on page 1 of the CPU
The following words were added to the end of the legal description to clarify what part of the property on the plan of survey is subject to the CPU:
‘namely the part outlined in green on the Plan of Survey dated November 7, 2022, a copy of which is attached to this CPU’;
Certificate of Requirement in Schedule ‘F’ of the CPU:
In line 1 the reference to the Item number was corrected, Item 4.8, not Item 4.9
In lines 7 and 8 to clarify the Property description the following words were added before the definition (“Property”):
‘namely the part outlined in green on the Plan of Survey dated November 7, 2022, a copy of which is attached to this Certificate of Property Use’
Plan of Survey
Plan of survey was updated indicating the Phase One Property in orange and Phase Two Property/RA Property/RSC Property as green on the plan attached to the CPU.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5775 Yonge Street
8th Floor
Toronto,
ON
M2M 4J1
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 18 janvier 2024 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
His Majesty the King in Right of Ontario as Represented by the Minister of Infrastructure
1 Dundas Street West
Suite 2000
Toronto,
ON
M5G 2L5
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Richard Saunders
5775 Yonge Street
8th Floor
Toronto,
ON
M2M 4J1
Canada
Proposition initiale
Détails de la proposition
A risk assessment was undertaken for this property to establish the risks that the contaminants identified in the risk assessment may pose to future users and to identify appropriate risk management measures to be implemented to ensure that the property is suitable for the intended use of parkland and community as defined by Ontario Regulation 153/04 (the "Regulation"), as amended, made under the Environmental Protection Act (the "Act").
Based on the documents provided to the ministry as part of the risk assessment reports, the reviewers confirmed that the risk assessment has been conducted in accordance with the Act, the Regulation, and the associated guidance documents. The director provided the proponent with written Notice of the Director’s Decision to accept the risk assessment relating to the property in accordance with section 168.5 of the Act.
The director is considering issuing a Certificate of Property Use (CPU) in relation to the property. The CPU incorporates the risk management measures proposed in the risk assessment and any additional conditions proposed by the director. A Section 197 Order is included and requires that a certificate be registered on the property title in accordance with section 197 of the Act and that before dealing with the property in any way, a copy of the CPU must be given to any person who will acquire an interest in the property.
The proposed risk management measures include:
- building construction restrictions
- property use restrictions
- barriers to site soils
- inspection and maintenance program of barriers to site soils
- soil and groundwater management plan
- site specific heath and safety plan for workers
- air monitoring requirements
- reporting requirements
The proposed CPU No. 6542-CXZNXT, including the Section 197 Order, is provided as a link under the supporting materials section of this notice.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5775 Yonge Street
8th Floor
Toronto,
ON
M2M 4J1
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 29 novembre 2023
au 29 décembre 2023
Communiquer avec nous
Contact
Richard Saunders
5775 Yonge Street
8th Floor
Toronto,
ON
M2M 4J1
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
1Par la poste
0