Cette consultation a eu lieu :
du 24 mai 2024
au 23 juin 2024
Résumé de la proposition
This proposal is for an amendment to Permit To Take Water No. 4488-CKYR9A for construction dewatering purposes. Water will be taken from three (3) ponds located in Ottawa.
Détails de l'emplacement
Adresse du site
3 Selkirk Street
Ottawa,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
RIVERAIN DEVELOPMENTS INC.
109 Atlantic Avenue
Toronto,
ON
M6K1X4
Canada
Détails de la proposition
This proposal is for an amendment to Permit To Take Water No. 4488-CKYR9A for construction dewatering associated with a hi-rise development. Water will be taken from three (3) ponds for construction dewatering purposes. Details of the water taking are as follows:
Source of water: Building Excavation
Purpose of taking: Construction Dewatering
- maximum rate per minute (Litres): 1,389
- maximum number of hours of taking per day: 24
- maximum volume per day (Litres): 2,000,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- length of time: 6 years
Source of water: Elevator Pits
Purpose of taking: Construction Dewatering
- maximum rate per minute (Litres): 6,944
- maximum number of hours of taking per day: 24
- maximum volume per day (Litres): 10,000,000
- maximum number of days of taking per year: 120
- earliest calendar date of taking (mm/dd): 05/01
- latest calendar date of taking (mm/dd): 12/31
- length of time: 4 months
Source of water: Impacted Groundwater
Purpose of taking: Construction - dewatering
- maximum rate per minute (Litres): 2,800
- maximum number of hours of taking per day: 24
- maximum volume per day (Litres): 500,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- length of time: 6 years
There are 3 categories of a Permit to Take Water:
- category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 24 mai 2024
au 23 juin 2024