James Dick Construction Limited - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
019-9325
Numéro de référence du ministère
1000142989
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 29 octobre 2024 au 28 novembre 2024 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 29 octobre 2024
au 28 novembre 2024

Résumé de la proposition

This proposal is for a new Permit to Take Water for James Dick Construction Limited. Water will be taken from two ponds for aggregate dewatering purposes at the Glen Christie Quarry, located at 2145 Waterloo Regional Road 24 in Cambridge, Ontario.

Détails de l'emplacement

Adresse du site

2145 Waterloo Regional Road 24
Cambridge, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

James Dick Construction Limited
14442 Regional Road 50
P.O. Box 470
Bolton, ON
L7E 3E2
Canada

Détails de la proposition

This proposal is for a new Permit to Take Water for James Dick Construction Limited. Water will be taken for aggregate extraction dewatering purposes at the Glen Christie Quarry, located at 2145 Waterloo Regional Road 24in Cambridge, Ontario. Details of the water taking are as follows:

Source Name:Lower Quarry Lake

  • purpose: aggregate extraction - dewatering
  • maximum rate per minute (litres): 9,550
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres):13,752,000
  • maximum number of days of taking per year: 120
  • period of taking: January 1 to December 31 for 10 years

Source Name:Quarry Sump

  • purpose: aggregate extraction - dewatering
  • maximum rate per minute (litres): 6,900
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 9,936,000
  • maximum number of days of taking per year: 365
  • period of taking: January 1 to December 31 for 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 3 permit.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 29 octobre 2024
au 28 novembre 2024

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis