Miller Paving Limited - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
019-9363
Numéro de référence du ministère
1000300009
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 8 novembre 2024 au 8 décembre 2024 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 8 novembre 2024
au 8 décembre 2024

Résumé de la proposition

This proposal is for a renewal to Permit to Take Water No. 2087-9MJPKQ for Miller Paving Limited. Water will be taken from Black Bay Creek for dust suppression and aggregate washing purposes at the Turcotte Pit, located in Petawawa, Ontario.

Détails de l'emplacement

Adresse du site

801 Rantz Road
Petawawa, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Miller Paving Limited
281 Hillmount Road, Suite 101
P.O. Box 4080
Markham, ON
L6C 2S3
Canada

Détails de la proposition

This proposal is for a renewal to Permit to Take Water No. 2087-9MJPKQ for Miller Paving Limited. Water will be taken from Black Bay Creek for dust suppression and aggregate washing purposes at the Turcotte Pit, located in Petawawa, Ontario. Details of the water taking is as follows:

Permit type – renewal

Source Name: Black Bay Creek

  • purpose of taking: aggregate washing
  • maximum rate per minute (litres): 4,200
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 4,180,000
  • maximum number of days of taking in a year: 233
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • length of taking: 10 years

Source Name: Black Bay Creek

  • purpose of taking: dust suppression
  • maximum rate per minute (litres): 4,200
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day (litres): 267,000
  • maximum number of days of taking in a year: 233
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • length of taking: 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 1 permit.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 8 novembre 2024
au 8 décembre 2024

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis