St. Marys Cement Inc. (Canada) - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
019-9484
Numéro de référence du ministère
8422-DB9UUU
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 19 décembre 2024 au 18 janvier 2025 (30 jours) Ouvert
Dernière mise à jour

Cette consultation se termine à 23 h 59 le :
18 janvier 2025

Résumé de la proposition

This proposal is to amend the Permit to Take Water No. 5436-CAMTAG for St. Marys Cement Inc. (Canada). Water will be taken from five wells and two ponds for industrial, water supply and dewatering purposes at 585 Water Street South, located in St. Marys, Ontario.

Détails de l'emplacement

Adresse du site

585 Water Street South
St. Marys, ON
N4X 1B6
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

St. Marys Cement Inc. (Canada)
585 Water Street South
St. Marys, ON
N4X 1B6
Canada

Détails de la proposition

This proposal is to amend the Permit to Take Water No. 5436-CAMTAG for St. Marys Cement Inc. (Canada). Water will be taken from five wells and two ponds for industrial, water supply and dewatering purposes at 585 Water Street South, located in St. Marys, Ontario. This application is for the addition of a water taking source for emergency fire suppression and increased storm event dewatering. Details of the water taking are as follows:

Source of water: Deep Well 3

  • source type: well
  • purpose of taking: industrial - cooling water
  • maximum rate per minute (litres): 3,024
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 4,354,560
  • maximum number of days of taking per year: 365
  • period of taking: January 1 to December 31 for 10 years

Source of water: Deep Well 4

  • source type: well
  • purpose of taking: industrial - cooling water
  • maximum rate per minute (litres): 2,703
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 3,892,320
  • maximum number of days of taking per year: 365
  • period of taking: January 1 to December 31 for 10 years

Source of water: Deep Well 5

  • source type: well
  • purpose of taking: industrial - cooling water
  • maximum rate per minute (litres): 2,841
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 4,091,000
  • maximum number of days of taking per year: 60
  • period of taking: January 1 to December 31 for 10 years

Source of water: Garage Well

  • purpose of taking: water supply
  • maximum rate per minute (litres): seven
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 10,000
  • maximum number of days of taking per year: 365
  • period of taking: January 1 to December 31 for 10 years

Source of water: Crusher Well

  • purpose of taking: water supply
  • maximum rate per minute (litres): one
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 2,000
  • maximum number of days of taking per year: 365
  • period of taking: January 1 to December 31 for 10 years

Source of water: South Quarry Pond

  • purpose of taking: dewatering
  • maximum rate per minute (litres): 13,888.9
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 20,000,000
  • maximum number of days of taking per year: 30
  • period of taking: January 1 to December 31 for 10 years

Source of water: South Quarry Pond

  • purpose of taking: dewatering
  • maximum rate per minute (litres): 6,944
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 10,000,000
  • maximum number of days of taking per year: 365
  • period of taking: January 1 to December 31 for 10 years

Source of water: North Quarry Sump

  • purpose of taking: dewatering
  • maximum rate per minute (litres): 2,100
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 30,240,000
  • maximum number of days of taking per year: 365
  • period of taking: January 1 to December 31 for 10 years

Source of water: South Quarry Pond

  • purpose of taking: industrial
  • maximum rate per minute (litres): 4,542.5
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 6,541,200
  • maximum number of days of taking per year: 30
  • period of taking: January 1 to December 31 for 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 3 permit

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

Dites-nous ce que vous pensez de notre proposition.

Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.

Lire nos politiques relatives aux commentaires et à la protection de la vie privée.

Soumettre en ligne

Soumettre par la poste

Contact

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis