GROUPE CRH CANADA INC./CRH CANADA GROUP INC. - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
025-0248
Numéro de référence du ministère
1000336353
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 8 avril 2025 au 8 mai 2025 (30 jours) Fermé
Dernière mise à jour

Update Announcement

This proposal notice has been updated on May 02, 2025, to indicate that the water will be taken from five (5) water taking sources instead of one well. The description of the proposal has not been changed. The original proposal date and public comment period remain unchanged.

Cette consultation a eu lieu :

du 8 avril 2025
au 8 mai 2025

Résumé de la proposition

This proposal is for a Permit to Take Water for GROUPE CRH CANADA INC./CRH CANADA GROUP INC. Water will be taken from five (5) water taking sources for construction dewatering conditions.

Détails de l'emplacement

Adresse du site

9410 DUBLIN LINE
Milton, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

GROUPE CRH CANADA INC./CRH CANADA GROUP INC.
2300 STEELES Avenue West
Concord, ON
L4K5X6
Canada

Détails de la proposition

This proposal is for a Permit to Take Water for GROUPE CRH CANADA INC./CRH CANADA GROUP INC. Water will be taken from five (5) water taking sources for construction dewatering purposes at the Milton Quarry site. Details of the water taking are as follows:

Application type: renewal

Source name: central sump dewatering, long-term conditions (pond)

  • purpose: aggregate washing
  • maximum rate of per minute (litres): 72,000
  • maximum number of hours of taking a day: 24
  • maximum volume per day (litres): 103,680,000
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): January 1
  • latest calendar date of taking (mm/dd): December 31
  • period of taking: up to 10 years

Source name: main quarry discharge, interim conditions (pond)

  • purpose: aggregate extraction
  • maximum rate of per minute (litres): 12,000
  • maximum number of hours of taking a day: 24
  • maximum volume per day (litres): 17,280,000
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): January 1
  • latest calendar date of taking (mm/dd): December 31
  • period of taking: up to 10 years

Source name: north quarry and extension areas (pond)

  • purpose: aggregate extraction
  • maximum rate of per minute (litres): 45,000
  • maximum number of hours of taking a day: 24
  • maximum volume per day (litres): 64,800,000
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): January 1
  • latest calendar date of taking (mm/dd): December 31
  • period of taking: up to 10 years

Source name: operations water use, long-term conditions (pond)

  • purpose: site rehabilitation
  • maximum rate of per minute (litres): 12,000
  • maximum number of hours of taking a day: 24
  • maximum volume per day (litres): 17,280,000
  • maximum number of days of taking in a year: 240
  • earliest calendar date of taking (mm/dd): January 1
  • latest calendar date of taking (mm/dd): December 31
  • period of taking: up to 10 years

Source name: recharge system (pond)

  • purpose: aggregate extraction
  • maximum rate of per minute (litres): 36,000
  • maximum number of hours of taking a day: 24
  • maximum volume per day (litres): 51,840,000
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): January 1
  • latest calendar date of taking (mm/dd): December 31
  • period of taking: up to 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 3 permit.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 8 avril 2025
au 8 mai 2025

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis