New Gold Inc. - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
025-0886
Numéro de référence du ministère
7347-DJLJQN
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 12 septembre 2025 au 27 octobre 2025 (45 jours) Ouvert
Dernière mise à jour

Cette consultation se termine à 23 h 59 le :
27 octobre 2025

Résumé de la proposition

This proposal is for an amendment to Environmental Compliance Approval No. 2290-CAVKGN for industrial sewage works serving the Rainy River Mine located at 5967 Highway 11/71, in the Township of Emo, Ontario.

Détails de l'emplacement

Adresse du site

ON
Canada

Détails de l'emplacement du site

Rainy River Mine is located in the Municipality of Chapple, approximately 50 km north of Emo, Ontario.

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

New Gold Inc.
5967 Highway 11/71
Emo, ON
P0W 1E0
Canada

Détails de la proposition

This proposal is for an amendment to Environmental Compliance Approval No. 2290-CAVKGN for industrial sewage works serving the Rainy River Mine located at 5967 Highway 11/71, in the Township of Emo, Ontario.

New Gold Inc. is proposing to amend its existing Environmental Compliance Approval to increase the total effluent treatment capacity at the Rainy River Mine to 59,000 cubic metres per day and the authorized discharge to the Pinewood River to 126,000 cubic metres per day. The proposed increase is required to manage site-wide water volumes and ensure ongoing regulatory compliance as mine operations expand.

Scope of Proposed Changes:

  • increase maximum effluent treatment capacity to 59,000 cubic metres per day
  • increase maximum discharge limit to the Pinewood River to 126,000 cubic metres per day
  • expand the Domestic Sewage Treatment Plant to support up to 900 site personnel
  • install a new septic system to serve an additional 200 personnel at the Underground Laydown Area

Rationale:

The amendment is driven by long-term mine water balance forecasts, which show that higher treatment and discharge capacities are necessary to control pond volumes within the Tailings Management Area. This requirement becomes more pronounced after 2029 due to increased pore water release from the tailings. Additionally, with the ramp-up of underground operations, the mine requires expanded sewage treatment infrastructure to support the projected workforce.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

Dites-nous ce que vous pensez de notre proposition.

Vous avez des questions? Contactez la personne-ressource indiquée ci-dessous. Veuillez indiquer le numéro du REO de l’avis dans votre courriel ou votre lettre à la personne-ressource.

Lire nos politiques relatives aux commentaires et à la protection de la vie privée.

Soumettre en ligne

Soumettre par la poste

Contact

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis