Résumé de la décision
The application for an amended Environmental Compliance Approval for Detour Gold Corporation has been withdrawn, at the request of the proponent. No amended ECA was issued.
Détails de l'emplacement
Détails de l'emplacement du site
185 km Northeast of Cochrane
Cochrane
District of Cochrane
P0L 1C0
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Detour Gold Corporation
199 Bay Street
4100
Toronto,
ON
M5L 1E2
Canada
Détails de la décision
On November 23, 2017 the applicant withdrew this application for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (Air & Noise) No. 6778-8YKQV9 for Detour Gold Corporation, a gold mining and processing facility located in the Town of Cochrane, District of Cochrane, Ontario.
We have withdrawn the application and closed the file. No amended ECA was issued.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
5520 Hwy 101 E
PO Bag 3080
South Porcupine,
ON
P0N 1H0
Canada
How to Appeal
Appeals are not allowed
There is no mechanism to appeal an application which has been withdrawn.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
Description of instrument
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (Air & Noise) No. 6778-8YKQV9 for Detour Gold Corporation, a gold mining and processing facility located in the Town of Cochrane, District of Cochrane, Ontario.
The emission sources from the manufacturing and associated processes that exhaust to the air include open pit gold mining operations, drilling operations, ore crushing, and ore processing.
The amendment includes replacement of waste rock crushers, removal of assembly welding and concrete batch plants, replacement of emission control equipment, addition of cyanide detox tank, and lead nitrate plant.
Emissions to the air from this facility include total suspended particulates, nitrogen oxides, carbon monoxide, potassium, and nickel.
The Environmental Compliance Approval with Limited Operational Flexibility (Air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
5520 Hwy 101 E
PO Bag 3080
South Porcupine,
ON
P0N 1H0
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 15 juin 2017
au 30 juillet 2017
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0