It is outrageous that this is being considered without a plan for an enclosed facility. With weather being more extreme, there must be a thoroughly thought out ans well executed storm water runoff plan. An enclosed building to store the biosolids needs to be made mandatory. It needs to be a permanent structure, full walls, solid (ie not fabric/tarp roof). Severe storms and flooding are becoming far too common to not have properly contained biosolids. Containment and storm water management must be a priority when considering the development of this facility. The risk of contaminating area waterways is far to great to turn a blind eye!