Commentaire
I believe that it is a mistake to close the white pines project in the first place. It's near completion. Shutting it down will open the province to lawsuits. It was to be a source of renewable energy, and given that it's almost done construction, there will be little additional cost to adding that power to our grid.
Soumis le 15 novembre 2018 4:26 PM
Commentaire sur
Nouveau règlement pris en application de la Loi sur la protection de l’environnement pour fermer le projet de parc éolien White Pines
Numéro du REO
013-3835
Identifiant (ID) du commentaire
11765
Commentaire fait au nom
Statut du commentaire