Commentaire
This project should not be shut down. It is a carbon-neutral power generation project that is almost complete. Public funds have already been invested in the project and that money will be wasted if it is shut down. OPG projects power shortages as soon as the mid-2020s and we should not be closing down climate-positive generating capacity.
Soumis le 15 novembre 2018 7:21 PM
Commentaire sur
Nouveau règlement pris en application de la Loi sur la protection de l’environnement pour fermer le projet de parc éolien White Pines
Numéro du REO
013-3835
Identifiant (ID) du commentaire
11832
Commentaire fait au nom
Statut du commentaire