Commentaire
Comment ID: 210805
Further execution of this project puts me and my family at risk. -Sound Impact operationally and during construction. -Water quality for the greater area. -Quality and requirement, of such long term structural footprints are suspect. -Benefit to the consuming public suspect. All of the above have been debated and challenged with much review. We need time for existing infrastructure to show adequate results. Every new location requires proof of success no one size fits all. I am opposed to any further construction of this project as it stands.
Soumis le 23 mai 2019 10:23 AM
Commentaire sur
Otter Creek Wind Farm General Partnership Incorporated, à titre de commandité de et au nom d’Otter Creek Wind Farm LP - Autorisation de projet d’énergie renouvelable
Numéro du REO
013-1043
Identifiant (ID) du commentaire
31394
Commentaire fait au nom
Statut du commentaire