Comment ID: 210805 Further…

Numéro du REO

013-1043

Identifiant (ID) du commentaire

31394

Commentaire fait au nom

Individual

Statut du commentaire

Commentaire

Comment ID: 210805

Further execution of this project puts me and my family at risk. -Sound Impact operationally and during construction. -Water quality for the greater area. -Quality and requirement, of such long term structural footprints are suspect. -Benefit to the consuming public suspect. All of the above have been debated and challenged with much review. We need time for existing infrastructure to show adequate results. Every new location requires proof of success no one size fits all. I am opposed to any further construction of this project as it stands.