Commentaire
ERO # 13-5000
1. Proposed ON-SITE USE AND EXCESS SOIL MANAGEMENT REGULATION
• Operation of a reuse site section 13.1, the proposed limit of 10,000 m3 is much higher than the previously proposed limit of 2,000 m3. Most Site Alteration By-laws consider limits of 2,000 to 5,000 m3 to be large fill operations at reuse sites. A smaller threshold should be considered.
2. Rules for on-site Excess Soil Management
• PART II EXCESS SOIL PLANNING AND MANGEMENT REQUIREMENTS
• 2. Tracking System, a proposed Haul route should be included on the registry to provide notice to local municipalities of potential unexpected truck traffic on the municipal road networks.
3. Proposed Amendments to O.Reg. 153/04 (Brownfields)
• No Comment
4. Proposed Amendments to Regulation 347 (Waste)
• No comment
5. Proposed Beneficial Reuse Assessment Tool
• No comment.
Soumis le 12 juin 2019 11:46 AM
Commentaire sur
Projet de Règlement sur la Terre d’Excavation et Modifications du Règlement sur les Dossiers de l’état des Sites (Friches Industrielles)
Numéro du REO
013-5000
Identifiant (ID) du commentaire
32163
Commentaire fait au nom
Statut du commentaire