Update Announcement
This proposal was originally posted on July 8, 2024, with a 45 day comment period ending August 22, 2024.The notice incorrectly had the location of the activity as 795 River Road when it should have been 794 River Road. The notice has been updated to correct this typographical error.
Cette consultation a eu lieu :
du 8 juillet 2024
au 22 août 2024
Résumé de la décision
A new Environmental Compliance Approval with Limited Operational Flexibility (air & noise) was issued to G W Metal Mining Inc., a plastic, steel and e-waste shredding and recycling facility, located in the City of Pembroke, Ontario.
Détails de l'emplacement
Adresse du site
794 River Road
Pembroke,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
G W Metal Mining Inc.
794 River Road
Pembroke,
ON
K8A 1A6
Canada
Détails de la décision
A new Environmental Compliance Approval with Limited Operational Flexibility (air & noise) was issued to G W Metal Mining Inc., a plastic, steel and e-waste shredding and recycling facility, located in the City of Pembroke, Ontario.
The Facility Production Limit is up to processing of 15,600 tonnes of waste per year.
The emission sources from the Facility include six dust collectors and associated processes that discharge to the air include:
- weighing
- sorting; and
- shredding
Emissions to the air from this facility include:
- aluminum
- cadmium
- copper
- iron
- lead
- mercury
- nickel
- manganese
- particulate matter
- phosphorus
- polyvinyl chloride
- polyethylene
- polypropylene
- acrylonitrile butadiene
- polystyrene
- silicon dioxide
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The Limited Operational Flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Effets de la consultation
Public Consultation Summary
A total of 10 comments were received by the ministry regarding this proposal: one through the Environmental Registry and nine by email. All comments were carefully reviewed and, where appropriate, considered in the ministry’s decision.
Ministry’s Response to Comments
As part of the Environmental Compliance Approval (ECA) process, the application underwent a detailed technical review to assess potential emissions of contaminants. The applicant was required to demonstrate compliance with Ontario Regulation 419/05: Air Pollution – Local Air Quality, which establishes stringent limits on contaminant concentrations.
Using emission estimates and approved air dispersion models, the review confirmed that predicted contaminant concentrations are within the ministry’s allowable limits. These limits are designed to protect public health.
The ministry remains committed to ensuring that facilities operate in a manner that safeguards air quality and human health. Compliance will continue to be monitored through conditions included in the ECA.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 17 décembre 2025 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
G W Metal Mining Inc.
794 River Road
Pembroke,
ON
K8A 1A6
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from G W Metal Mining Inc., a plastic, steel and e-waste shredding and recycling facility, located in the City of Pembroke, Ontario.
The application includes all sources at the facility, including a natural gas boiler and six main processing lines for e-waste, plastic and cardboard materials, each with a dedicated dust collector. Emissions to the air from this facility include:
- nickel,
- cadmium,
- particulate matter,
- mercury,
- lead,
- manganese,
- phosphorus, and
- beryllium
The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 8 juillet 2024
au 22 août 2024
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada