Cette consultation a eu lieu :
du 27 janvier 2025
au 26 février 2025
Résumé de la proposition
This proposal is for the renewal of Permit to Take Water No. 3048-9VEKRN for G. Tackaberry & Sons Construction Company Limited. Water will be taken from one pond for pits and quarries dewatering, aggregate washing, dust suppression and construction purposes, located in the Township of Elizabethtown-Kitley, Ontario.
Détails de l'emplacement
Adresse du site
Woods Quarry
Elizabethtown-Kitley,
ON
Canada
Détails de l'emplacement du site
Lot: 20, Concession: 5, Geographic Township: Elizabethtown
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
G. Tackaberry & Sons Construction Company Limited
Post Office Box No. 70
Athens,
ON
K0E 1B0
Canada
Détails de la proposition
This proposal is for the renewal of Permit to Take Water No. 3048-9VEKRN for G. Tackaberry & Sons Construction Company Limited. Water will be taken from one pond for pits and quarries dewatering, aggregate washing, dust suppression and construction purposes, located in the Township of Elizabethtown-Kitley, Ontario. Details of the water taking are as follows:
Permit type – renewal
Source Name: Quarry Sump
Purpose: Pits and Quarries - Dewatering
- maximum rate per minute (litres): 5,455
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 7,855,488
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source Name: Quarry Sump
Purpose: Aggregate Washing
- maximum rate per minute (litres): 5,455
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 7,855,488
- maximum number of days of taking per year: 292
- earliest calendar date of taking (mm/dd): 03/01
- latest calendar date of taking (mm/dd): 12/15
- period of taking: 10 years
Source Name: Quarry Sump
Purpose: Dust Suppression
- maximum rate per minute (litres): 1,500
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 1,080,000
- maximum number of days of taking per year: 292
- earliest calendar date of taking (mm/dd): 03/01
- latest calendar date of taking (mm/dd): 12/15
- period of taking: 10 years
Source Name: Quarry Sump
Purpose: Construction
- maximum rate per minute (litres): 1,500
- maximum number of hours of taking per day: 12
- maximum volume per day (litres): 1,080,000
- maximum number of days of taking per year: 292
- earliest calendar date of taking (mm/dd): 03/01
- latest calendar date of taking (mm/dd): 12/15
- period of taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 27 janvier 2025
au 26 février 2025