Update Announcement
This proposal was originally posted on July 24, 2025 with a 30 day public comment period ending August 23, 2025. It was updated August 5, 2025, to revise the proposal. The comment period has been restarted.
Cette consultation a eu lieu :
du 24 juillet 2025
au 4 septembre 2025
Résumé de la proposition
This proposal is for the renewal of Permit to Take Water No. 7573-BTFRS3 for 2674177 ONTARIO INC. Water will be taken from Nottawasaga River and three ponds for recreational purposes, in the Town of Mono, County of Dufferin, Ontario.
Détails de l'emplacement
Adresse du site
793522 3RD LINE EHS
Mono,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
2674177 ONTARIO INC.
793522 3RD LINE EHS
Mono,
ON
L9W 5X7
Canada
Détails de la proposition
This proposal is for the renewal of Permit to Take Water No. 7573-BTFRS3 for 2674177 ONTARIO INC. Water will be taken from Nottawasaga River and three ponds for recreational purposes, in the Town of Mono, County of Dufferin, Ontario. Details of Water Taking are as follows:
Purpose of water taking: other
- source of water: pond # two(west)
- maximum rate (litres per minute): 1,000
- maximum number of hours of taking per day: 24
- maximum volume (litres per day): 1,440,000
- maximum number of days of taking in a year: 240
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: 10 years
Purpose of water taking: snowmaking
- source of water: pond # one (east)
- maximum rate (litres per minute): 4,730
- maximum number of hours of taking per day: 24
- maximum volume (litres per day): 6,811,200
- maximum number of days of taking in a year: 120
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 03/31
- period of water taking: 10 years
Purpose of water taking: golf course irrigation
- source of water: pond # one (east)
- maximum rate (litres per minute): 1,900
- maximum number of hours of taking per day: 16
- maximum volume (litres per day): 1,824,000
- maximum number of days of taking in a year: 120
- earliest calendar date of taking (mm/dd): 05/01
- latest calendar date of taking (mm/dd): 10/31
- period of water taking: 10 years
Purpose of water taking: snowmaking
- source of water: nottawasaga river
- maximum rate (litres per minute): 3,785
- maximum number of hours of taking per day: 24
- maximum volume (litres per day): 5,450,400
- maximum number of days of taking in a year: 120
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 03/31
- period of water taking: 10 years
Purpose of water taking: golf course irrigation
source of water: nottawasaga river
- maximum rate (litres per minute): 950
- maximum number of hours of taking per day: 16
- maximum volume (litres per day): 912,000
- maximum number of days of taking in a year: 120
- earliest calendar date of taking (mm/dd): 05/01
- latest calendar date of taking (mm/dd): 10/31
- period of water taking: 10 years
There are 3 categories of a Permit to Take Water:
Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 3 permit.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 24 juillet 2025
au 4 septembre 2025