Sherborne Lodge Developments Limited - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
019-5312
Numéro de référence du ministère
0025-CCZLPX
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 31 mars 2022 au 30 avril 2022 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 31 mars 2022
au 30 avril 2022

Résumé de la décision

We have issued a new Permit to Take Water No. 0644-CEWPGH on June 2, 2022, which cancels and replaces Permit to Take Water No. 0580-BBXGY6 for Sherborne Lodge Developments Limited, for dewatering purposes. Water will be taken from one pond related to construction activities in the Town of Oakville, Regional Municipality of Halton, Ontario.

Détails de l'emplacement

Adresse du site

Lot 19, Concession 1 North of Dundas Street
Oakville, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Sherborne Lodge Developments Limited
8600 Dufferin Street
Vaughan, ON
L4K 5P5
Canada

Détails de la décision

We have issued a new Permit to Take Water No. 0644-CEWPGH on June 2, 2022, which cancels and replaces Permit to Take Water No. 0580-BBXGY6 for Sherborne Lodge Developments Limited, for dewatering purposes. Water will be taken from one pond related to construction activities in the Town of Oakville, Regional Municipality of Halton, Ontario. The new permit expires on June 2, 2024.

Details of water taking are as follows:

Source of water: pond - connected

  • purpose of water taking: dewatering - construction
  • maximum rate (litres per minute): 2,790
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 4,000,000
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of water taking: January 1 to December 31 for 2 years

Request a copy of the permit.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

1

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

One comment was received via email identifying concerns with this Permit to Take Water proposal. The main concerns raised were regarding the following:

  • obtaining approval for the elimination of the pond pursuant to Ontario Regulation 162/06 prior to commencement of any water taking
  • comments regarding the dewatering rate, monitoring, mitigation and contingency plan which were previously identified in a letter dated February 17, 2016

Response:

Comments relevant to the water taking proposal were considered as part of the review of the application. Regarding the first comment, the proponent has submitted the Environmental Implementation Report to Halton Region Conservation Authority in order to obtain the required approval. All other comments have been addressed through conditions in the Permit to Take Water.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 7 juin 2022 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.

Appeal process for decisions published before June 1, 2021

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON 
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Archana Uprety
Hydrogeologist Permit to Take Water (Acting)

Environmental Permissions Branch
135 St Clair Avenue West
Toronto, ON
M4V 1P5
Canada

(647) 248-9672

Proponent(s)

Sherborne Lodge Developments Limited
8600 Dufferin Street
Vaughan, ON
L4K 5P5
Canada


Organe d’appel

Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Environmental Review Tribunal


Inclure les éléments suivants:

Numéro du REO
019-5312
Numéro de référence du ministère
0025-CCZLPX

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-5312
Numéro de référence du ministère
0025-CCZLPX
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

31 mars 2022 - 30 avril 2022 (30 days)

Détails de la proposition

This proposal is to renew Permit to Take Water No. 0580-BBXGY6 for Sherborne Lodge Developments Limited for dewatering purposes. Water will be taken from one (1) pond related to construction activities, located in the Town of Oakville, Regional Municipality of Halton, Ontario. Details of water taking are as follows:

Source of water: Pond - Connected

  • purpose of water taking: dewatering - construction
  • maximum rate (litres per minute): 2,791
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 4,020,000
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31
  • period of water taking: January 1 to December 31 for 2 years

More about Permits to take water

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 31 mars 2022
au 30 avril 2022

Communiquer avec nous

Contact