Update Announcement
This proposal notice is being updated on December 5, 2024 to advise the public that the permit application is still under review and the Ministry is considering concerns raised by an Aboriginal community which warrant additional time to adequately consider. The original proposal date and comment period have not been altered. The anticipated date of decision is December 15, 2024.
This consultation was open from:
July 18, 2024
to August 17, 2024
Decision summary
The Director of Exploration has made a decision on the exploration permit application PR-24-000146 to BEN NEVIS RESOURCES INC. for early exploration activities.
The decision is to issue the mineral exploration permit.
Location details
Site location details
The early exploration activities are located approximately twenty kilometres north by north east of Dobie, Ontario, in Ben Nevis township, District of Cochrane.
Claim numbers instructions: To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.
Claim numbers: 510602, 510614
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
BEN NEVIS RESOURCES INC
14579 Government Road
P.O. Box 219
Larder Lake,
ON
P0K 1L0
Canada
Decision details
On December 16, 2024 the ministry issued the proposed early exploration permit.
This permit will allow the company to conduct:
- mechanized stripping
The exploration permit was issued once all Indigenous communities and the public had the opportunity to provide comment or raise their concerns. The Exploration Permit duration will be up to 3 years with the possibility of renewal.
Effects of consultation
No comments were received resulting in no impact on the decision to proceed or not with this proposal.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
How to Appeal
Appeals are not allowed
This instrument type cannot be appealed. Learn more about our consultation process.
Connect with us
Contact
Andrew Persad
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Original proposal
Proposal details
The proponent has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.
The activities that this permit would allow the proponent to carry out are as follows:
- mechanized surface stripping (greater than 100 square metres in a 200 metres radius)
The potential disturbance from the activities are described as:
Mechanized Surface Stripping uses heavy equipment to remove vegetation and soil (overburden) from bedrock. The potential environmental disturbance includes (but are not limited to): use of heavy equipment such as bulldozers, backhoes, excavators or forest harvest equipment, to remove soil from the bedrock, washing the bedrock by pumping water from nearby lakes, rivers or streams, and creation of access trails.
Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).
This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of renewal.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
Comment
Commenting is now closed.
This consultation was open from July 18, 2024
to August 17, 2024
Connect with us
Contact
Andrew Persad
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Comments received
Through the registry
0By email
0By mail
0