Latem Industries Limited - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-9305
Ministry reference number
3558-D9MHHK
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
October 25, 2024 - December 9, 2024 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
December 9, 2024

Proposal summary

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) from Latem Industries Limited, a metal coating and finishing facility, located in the City of Cambridge, Ontario.

Location details

Site address

90 Struck Court
Cambridge, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Latem Industries Limited
90 Struck Court
Cambridge, ON
N1R 8L2
Canada

Proposal details

This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for air at this facility and includes the addition of new or historically unapproved sources for all emissions from Latem Industries Limited, a metal coating and finishing facility, located in the City of Cambridge, Ontario.

The application includes all sources at the facility, including the emissions from the finishing, plastisol coating, nylon powder coating, and E-coating processes. The amendment includes the addition of Limited Operational Flexibility and the addition of the E-coat line, powder coat line, and cleaning oven equipment. Emissions to the air from this facility include:

  • distillates (petroleum) hydrotreated light,
  • distillates (petroleum) hydrotreated light paraffinic,
  • nitrogen oxides,
  • triglycidyl isocyanurate,
  • polyethylene glycol monooleate, and
  • phosphoric acid

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice