Magna Exteriors Inc. operating as Autosystems - Environmental Compliance Approval (air)

Instrument type: Environmental Compliance Approval (air)

ERO number
019-9496
Ministry reference number
6322-DASP8B
Notice type
Instrument
Act
Environmental Protection Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Proposal
Proposal posted
Comment period
December 16, 2024 - January 30, 2025 (45 days) Open
Last updated

This consultation closes at 11:59 p.m. on:
January 30, 2025

Proposal summary

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (Air) No. 7051-9KYLQK for Magna Exteriors Inc. operating as Autosystems (formerly known as Magna Exteriors and Interiors Corp.), an automotive lamp housing manufacturing facility located in the City of Belleville, Ontario.

Location details

Site address

200 Jamieson Bone Road
Belleville, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Magna Exteriors Inc. operating as Autosystems
200 Jamieson Bone Road
Belleville, ON
K8N 5T3
Canada

Proposal details

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (Air) No. 7051-9KYLQK for Magna Exteriors Inc. operating as Autosystems (formerly known as Magna Exteriors and Interiors Corp.), an automotive lamp housing manufacturing facility located in the City of Belleville, Ontario. The emission sources from the manufacturing and associated processes that discharge to the air include vacuum equipment; dust collector; sand blaster; cooling towers; silos; spray booths, assembly operations and boilers; Emissions to the air from this facility include:

  • particulate matter;
  • isopropyl alcohol;
  • 1-butanol;
  • methyl ethyl ketone; and
  • nitrogen oxides.

The Environmental Compliance Approval with Limited Operational Flexibility (Air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Comment

Let us know what you think of our proposal.

Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.

Read our commenting and privacy policies.

Submit online

Submit by mail

Contact

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice