This consultation was open from:
July 18, 2025
to September 1, 2025
Decision summary
Endrit Karaj requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn, and no approval was issued.
Location details
Site address
4 John Street
Buckhorn, Trent Lakes,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Endrit Karaj
5 Main Street
Buckhorn, Trent Lakes,
ON
K0L 1J0
Canada
Decision details
Endrit Karaj requested to withdraw their application for an Environmental Compliance Approval. The application is considered withdrawn, and no approval was issued.
On October 23, 2025, Mac's Convenience Stores Inc. requested to withdraw their application for an Environmental Compliance Approval, as the proposed works meet the eligibility requirement of O. Reg. 137/25.
The application is considered withdrawn, and no approval was issued. The ministry closed the file on October 26, 2025.
Effects of consultation
No comments were received.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
This proposal is for a new Environmental Compliance Approval (sewage) to install stormwater management works facilities for Endrit Karaj, for the collection, transmission, treatment and disposal of stormwater run-off from the lands located at four John Street, Buckhorn, Trent Lakes Municipality, Ontario.
The proposed stormwater system includes ditches for quality and quantity control; discharging from the enhanced grass swale via a hicken bottom outlet structure outletting to a rip-rap covered area. The stormwater discharge from the site will be directed through an existing drainage swale and enter Buckhorn Lake approximately 100 metres southeast from the subject property.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
This consultation was open from July 18, 2025
to September 1, 2025
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0