This notice is for informational purposes only. There is no requirement to consult on this initiative on the Environmental Registry of Ontario. Learn more about the types of notices on the registry.
Why consultation isn't required
The director has determined this amendment is not considered to be environmentally significant. Therefore, under the Environmental Bill of Rights consultation is not required where the director feels that the potential effects of the amendment on the environment is insignificant.
The director is using this Bulletin to inform the public.
Bulletin details
The director has amended Environmental Compliance Approval (air & noise) No. 6254-9LVQ3V for Imperial Oil Limited, a petroleum refining and petrochemical manufacturing facility located in the City of Sarnia, Ontario.
The amendment to this approval is for the temporary operation of two thermal oxidizers to mitigate benzene and other volatile organic compound emissions during:
- the degassing of storage tank TK-4023, and
- the floating of storage tank roofs for tanks TK-4023.
The amendment allows for the two thermal oxidizers to be operated until December 31, 2026.
Contaminant emissions to the atmosphere from the thermal oxidizers include:
- benzene
- light catalytic reformed naptha
- carbon monoxide
- nitrogen oxides
The facility is registered under the Petroleum Refining - Industry Standard (registration number 105-17-393-rv0 dated July 28, 2017) for Benzene and Benzo(a)pyrene emissions and the Petrochemical - Industry Standard (registration number 103-17-393-rv0 dated July 28, 2017) for Benzene emissions.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
1094 London Road
Sarnia,
ON
N7S 1P1
Canada
Connect with us
Contact
Malcolm Smith
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada