This consultation closes at 11:59 p.m. on:
November 21, 2025
Proposal summary
This proposal is for the renewal of Permit to Take Water No. 3118-9YVKVJ required for the purpose of ongoing residence heating/cooling needs of the building on Rogers Road, in the Town of Perth, County of Lanark.
Location details
Site address
23 Rogers Road
Perth,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Lanark Condominium Corporation No. 9
23 Rogers Road
perth,
ON
K7H 1P2
Canada
Proposal details
This proposal is for the renewal of Permit to Take Water No. 3118-9YVKVJ required for the purpose of ongoing residence heating/ cooling needs of the building on Rogers Road, in the Town of Perth, County of Lanark. Details of the water takings are as follows:
Purpose of Taking: Building heating/ cooling
- source of water: drilled well (TW1)
- maximum rate per minute (litres/minute): 300
- maximum number of hours of taking a day: 24
- maximum volume per day (litres): 432,000
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: 10 years
Purpose of Taking: Building heating/ cooling
- source of water: drilled well (TW3)
- maximum rate per minute (litres/minute): 120
- maximum number of hours of taking a day: 24
- maximum volume per day (litres): 172,800
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: 10 years
Purpose of Taking: Building heating/ cooling
- source of water: drilled well (TW4)
- maximum rate per minute (litres/minute): 300
- maximum number of hours of taking a day: 24
- maximum volume per day (litres): 432,000
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of water taking: 10 years
There are 3 categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Let us know what you think of our proposal.
Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.Read our commenting and privacy policies.
Submit online
Submit by mail
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada