This consultation was open from:
December 8, 2025
to January 22, 2026
Proposal summary
This proposal is to amend Environmental Compliance Approval No. 2084-ASQK9U for a waste disposal site located in Vaughan. The amendment would allow the company to change the processing equipment to accommodate additional throughput, enhance the material sorting/segregation for sands and gravels, and provide for dry soil washing capabilities.
Location details
Site address
550 Bowes Road
Vaughan,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Intelligent Soil Recycling Inc.
550 Bowes Road
Vaughan,
ON
L4K 1K2
Canada
Proposal details
This proposal is to amend Environmental Compliance Approval (waste processing site) No. 2084-ASQK9U for a dry and liquid soil processing facility located at 550 Bowes Road in the City of Vaughan.
The waste transfer and processing facility has a total area of 0.55 hectares, and processes dry and liquid soils for recovery of sands, gravels and other soils for beneficial reuse. The facility currently receives soil up to 7 days a week 5:30 am to 9:00 pm with processing occurring 24 hours per day, with up to 1,000 cubic metres per day, 234,000 tonnes per year, and on-site storage of up to 1,000 tonnes of processed soil.
This amendment request is to change the processing equipment to accommodate additional throughput, enhance the material sorting/segregation for sands and gravels, and provide for dry soil washing capabilities.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from December 8, 2025
to January 22, 2026