This consultation closes at 11:59 p.m. on:
February 28, 2026
Proposal summary
This proposal is to amend Environmental Compliance Approval No. 54-45-97 for the replacement of the Existing Grease Interceptor and Septic Tanks servicing Elmira Curling Club.
Location details
Site address
40 Eldale Road
Woolwich ,
ON
Canada
Site location details
Elmira Golf Club.
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Elmira Golf Club
40 Eldale Road
P.O. Box 61
Woolwich,
ON
N3B 2Z5
Canada
Proposal details
Elmira Golf Club seeks to amend Environmental Compliance Approval (ECA) No. 54-45-97, issued in 1997 under the Environmental Protection Act by the Region of Waterloo’s Community Health Department for construction of the Class 4 onsite wastewater system that services Elmira Golf Club and Elmira Curling Club (located at 40 Eldale Road in the Township of Woolwich).
Specifically, the applicant proposes to replace the existing grease interceptor and septic tanks.
The wastewater system was designed by Paragon Engineering (subsequently Stanley Consulting and now Stantec) and is comprised of a 1,000-litres grease interceptor tank, 22,000-litres septic tank, 4,141-litres effluent pump tank, and raised trench bed (sand fill area of 2,000 square metres and distribution pipe length of 500 metres).
The grease interceptor and septic tanks have reached the end of their service lives and are in a deteriorating state, and are therefore proposed to be replaced with a grease interceptor tank with a minimum effective volume of 6,000-litres and a septic tank with a minimum effective volume of 30,000 litres. The pump tank and raised bed are to be retained. The rated capacity of the wastewater system, as designed by Paragon, is 10,000 litres per day.
No building changes have occurred since issuance of the above-referenced ECA, nor are any building changes proposed in relation to the proposed tank replacements (i.e., no increase in peak wastewater flow); however, the Township of Woolwich has directed this matter to be addressed under the Ontario Water Resources Act.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Let us know what you think of our proposal.
Have questions? Get in touch with the contact person below. Please include the ERO number for this notice in your email or letter to the contact.Read our commenting and privacy policies.
Submit online
Submit by mail
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada